Roberts Gorden BH-125, BH-60, BH-40, BH-150, BH-175, BH-115, BH-100 Manifold Gas Pressure Setting

Page 59

SECTION 12: TROUBLESHOOTING

12.2 Manifold Gas Pressure Setting

53 of 59

Image 59
Contents Economical Unitary Page Roberts-Gordon LLC Page Table of Figures Page California Proposition Heater SafetyManpower Requirements Safety Labels and Their PlacementDescription Top and Bottom Panel Label PlacementDescription Part Number Side and Back Panel Label PlacementNational Standards and Applicable Codes Installer ResponsibilityWall Tag Clearances are the required distances that Maintain clearances to combustibles at all times for safetyCentimeters InchesC D Tube, Standard Reflector Model 45 Tilt Reflector ModelInches Centimeters Tube, Opposite 45 Reflector ModelVented UnventedNational Standards and Applicable Codes Reflector End Cap Major ComponentsStainless Steel Burner TubeContents of BH-Series Burner Carton Standard Parts ListCore Packages Minimum Standard Aluminized Heater Installation Run Length Typical Expansion Critical Hanger PlacementLinear Heater Assembly Overview Linear Heater Layout Overview Linear Heater Layout Overview Burner Tube InstallationTube Clamp Package Tube Clamp Package InstallationCoupling and Tube Assembly Model 1 Coupling and Tube Assembly2 Coupling and Tube Assembly Tube LengthTurbulator Installation Turbulator InstallationHanger Burner Tube Reflector Description Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Clip Package Elbow Package Configuration .2.1 Elbow InstallationBetween Burner and Elbow Elbow Package2 Elbow Installation Reflector Joint Detail 5 Reflector Joint Detail2 Side Reflector Installation Reflector Side Extension 1 Bracket InstallationDescription Part Number Lower Clearance Shield Package Description Part Number Reflector Side Extension 01370412 2 Frame Shield InstallationDistance a Extension 3 Grille Installation 2 Grille End Cap InstallationCanadian Requirements VentingUnited States Requirements Unvented Operation Tube Termination Unvented OperationHorizontal Venting Vertical VentingCommon Side Wall Venting Vertical Ventilation 4 10 cm PipeCommon Vertical Venting Description Part Number Vent Cap 4 10 cm 90502300 Vertical Outside Air Supply for Single Heater InstallationOutside Combustion Air Supply Description Part Number Vent Cap 6 15 cm 90502302 Vertical Outside Air Supply for Double Heater InstallationGAS Piping Failure to follow these instructions can result When attaching gas hoseCorrect Positions Hold gas nipple securely with pipe wrenchLine Voltage Thermostat Wiring WiringFront View Low Voltage Thermostat WiringInternal Wiring Ladder Diagram Electrical Connection to the Burner To Shut Off Heater Operation and MaintenancePre-Season Maintenance and Annual Inspection Sequence of OperationReflector Vicinity of the HeaterVehicles and Other ObjectsElectrode Safety LabelsBlower Scroll, Wheel Motor Burner Cup and OrificeTroubleshooting YES Troubleshooting Flow ChartPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number Pipe Connection General SpecificationsDimensions GAS Pressure AT ManifoldPage Limitations on Authority Representatives Warranty is Void ifROBERTS-GORDON LLC will PAY for ROBERTS-GORDON LLC will not PAY forPage Page Page
Related manuals
Manual 70 pages 23.9 Kb Manual 20 pages 37.5 Kb