Roberts Gorden BH-80, BH-60, BH-40, BH-150, BH-175, BH-115, BH-100, BH-140, BH-200, BH-125 service manual

Page 58

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

52 of 59

Image 58
Contents Economical Unitary Page Roberts-Gordon LLC Page Table of Figures Page Safety Labels and Their Placement Heater SafetyManpower Requirements California PropositionTop and Bottom Panel Label Placement DescriptionSide and Back Panel Label Placement Description Part NumberWall Tag Installer ResponsibilityNational Standards and Applicable Codes Maintain clearances to combustibles at all times for safety Clearances are the required distances thatC D InchesCentimeters 45 Tilt Reflector Model Tube, Standard Reflector ModelTube, Opposite 45 Reflector Model Inches CentimetersUnvented VentedNational Standards and Applicable Codes Burner Tube Major ComponentsStainless Steel Reflector End CapStandard Parts List Contents of BH-Series Burner CartonCore Packages Minimum Standard Aluminized Heater Installation Critical Hanger Placement Run Length Typical ExpansionLinear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Linear Heater Layout OverviewCoupling and Tube Assembly Tube Clamp Package InstallationTube Clamp Package Tube Length 1 Coupling and Tube Assembly2 Coupling and Tube Assembly ModelTurbulator Installation Turbulator InstallationHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Elbow Package Configuration .2.1 Elbow InstallationBetween Burner and Elbow Clip Package2 Elbow Installation 5 Reflector Joint Detail Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector InstallationDescription Part Number Lower Clearance Shield Package Distance a Extension 2 Frame Shield InstallationDescription Part Number Reflector Side Extension 01370412 2 Grille End Cap Installation 3 Grille InstallationUnited States Requirements VentingCanadian Requirements Vertical Venting Unvented OperationHorizontal Venting Unvented Operation Tube TerminationVertical Ventilation 4 10 cm Pipe Common Side Wall VentingCommon Vertical Venting Outside Combustion Air Supply Vertical Outside Air Supply for Single Heater InstallationDescription Part Number Vent Cap 4 10 cm 90502300 Vertical Outside Air Supply for Double Heater Installation Description Part Number Vent Cap 6 15 cm 90502302GAS Piping Hold gas nipple securely with pipe wrench When attaching gas hoseCorrect Positions Failure to follow these instructions can resultWiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the Burner Sequence of Operation Operation and MaintenancePre-Season Maintenance and Annual Inspection To Shut Off HeaterObjects Vicinity of the HeaterVehicles and Other ReflectorMotor Burner Cup and Orifice Safety LabelsBlower Scroll, Wheel ElectrodeTroubleshooting Troubleshooting Flow Chart YESPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number GAS Pressure AT Manifold General SpecificationsDimensions Pipe ConnectionPage ROBERTS-GORDON LLC will not PAY for Warranty is Void ifROBERTS-GORDON LLC will PAY for Limitations on Authority RepresentativesPage Page Page
Related manuals
Manual 70 pages 23.9 Kb Manual 20 pages 37.5 Kb