Roberts Gorden BH-140, BH-60, BH-40, BH-150, BH-175, BH-115, BH-100, BH-200, BH-80 Troubleshooting

Page 56

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

SECTION 12: TROUBLESHOOTING

DANGER

Electrical Shock Hazard

Disconnect electric before service.

Heater must be properly grounded.

Failure to follow these instructions can result in death or electrical shock.

WARNING

Fire Hazard

Explosion Hazard

Burn Hazard

Cut/Pinch Hazard

Keep all flammable

Turn off gas supply to

Allow heater to cool

Wear protective gear

objects, liquids and

heater before service.

before service.

during installation,

vapors the minimum

 

 

operation and service.

required clearances to

 

Tubing may still be hot

Edges are sharp.

combustibles away

 

after operation.

from heater.

 

 

 

Some objects will catch fire or explode when placed close to heater.

Failure to follow these instructions can result in death, injury or property damage.

50 of 59

Image 56
Contents Economical Unitary Page Roberts-Gordon LLC Page Table of Figures Page Heater Safety Manpower RequirementsSafety Labels and Their Placement California PropositionTop and Bottom Panel Label Placement DescriptionSide and Back Panel Label Placement Description Part NumberNational Standards and Applicable Codes Installer ResponsibilityWall Tag Maintain clearances to combustibles at all times for safety Clearances are the required distances thatCentimeters InchesC D 45 Tilt Reflector Model Tube, Standard Reflector ModelTube, Opposite 45 Reflector Model Inches CentimetersUnvented VentedNational Standards and Applicable Codes Major Components Stainless SteelBurner Tube Reflector End CapStandard Parts List Contents of BH-Series Burner CartonCore Packages Minimum Standard Aluminized Heater Installation Critical Hanger Placement Run Length Typical ExpansionLinear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Linear Heater Layout OverviewTube Clamp Package Tube Clamp Package InstallationCoupling and Tube Assembly 1 Coupling and Tube Assembly 2 Coupling and Tube AssemblyTube Length ModelTurbulator Installation Turbulator InstallationHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Configuration .2.1 Elbow Installation Between Burner and ElbowElbow Package Clip Package2 Elbow Installation 5 Reflector Joint Detail Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector InstallationDescription Part Number Lower Clearance Shield Package Description Part Number Reflector Side Extension 01370412 2 Frame Shield InstallationDistance a Extension 2 Grille End Cap Installation 3 Grille InstallationCanadian Requirements VentingUnited States Requirements Unvented Operation Horizontal VentingVertical Venting Unvented Operation Tube TerminationVertical Ventilation 4 10 cm Pipe Common Side Wall VentingCommon Vertical Venting Description Part Number Vent Cap 4 10 cm 90502300 Vertical Outside Air Supply for Single Heater InstallationOutside Combustion Air Supply Vertical Outside Air Supply for Double Heater Installation Description Part Number Vent Cap 6 15 cm 90502302GAS Piping When attaching gas hose Correct PositionsHold gas nipple securely with pipe wrench Failure to follow these instructions can resultWiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the Burner Operation and Maintenance Pre-Season Maintenance and Annual InspectionSequence of Operation To Shut Off HeaterVicinity of the Heater Vehicles and OtherObjects ReflectorSafety Labels Blower Scroll, WheelMotor Burner Cup and Orifice ElectrodeTroubleshooting Troubleshooting Flow Chart YESPage Manifold Gas Pressure Setting Replacement Parts Replacement Parts Description Part Number General Specifications DimensionsGAS Pressure AT Manifold Pipe ConnectionPage Warranty is Void if ROBERTS-GORDON LLC will PAY forROBERTS-GORDON LLC will not PAY for Limitations on Authority RepresentativesPage Page Page
Related manuals
Manual 70 pages 23.9 Kb Manual 20 pages 37.5 Kb