Powermate PM0105000 manual Portability KIT Installation, Wheel Installation

Page 8

PORTABILITY KIT INSTALLATION

TOOLS REQUIRED: 10mm, 13mm, and 16mm sockets and ratchets, block(s) of wood (minimum of 6” tall).

Refer to the parts list on page 37.

WHEEL INSTALLATION

1.Block up the engine end of generator to install wheel kit.

2.Insert wheel spacer (item 109) into the center of the wheel (item 108).

3.Slide M10 x 95 bolt (item 107) through the wheel (item 108), then through the wheel bracket on the carrier, with the offset side of the wheel hub against the wheel bracket.

4.Thread M10 nut (item 110) onto the bolt and tighten to securely clamp the wheel assembly to the carrier.

5.Repeat above instructions for the remaining wheel.

FOOT INSTALLATION

1.Assemble the rubber foot (item 113) to the foot bracket (item 114) using a M8 x 30 screw (item 112). Thread a M8 nut (item 111) to the screw to secure the assembly. Caution: Do not over tighten so that the foot material collapses.

2.Blocking up the alternator side of the generator, place the foot bracket under the carrier channel. Thread a M8 x 15 screw (item 115) through the mounting holes and thread a M8 nut (item 111) to the bolt to secure the foot bracket to the carrier.

3.Repeat above instructions for the remaining foot.

HANDLE INSTALLATION

1.Place handle (item 119) on carrier on same end as feet, as shown in the diagram.

2.Slide M6 x 28 screw (item 121) through handle and handle bracket as shown in diagram and secure with M6 nut (item 120). Tighten until handle is securely clamped to the carrier.

3.Apply aerosol hairspray or similar adhesive to the handle (item 119), and then slide the handle grip (item 117) onto the handle. The aerosol hairspray will allow for easier assembly and will adhere the grip to the handle.

LOCKING HANDLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1. Attach the lanyard (item 118) to the release

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

pin (item 122) and carrier as shown in the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

illustration.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. To lock the handle (item 119) in the extended

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

position, align the holes in the handle bracket

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

with the holes in the carrier bracket and insert

 

 

 

 

 

118

 

 

 

 

 

122

 

 

 

 

 

 

 

 

the release pin (item 122).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

English

 

8

 

Customer Hotline 1-800-445-1805

Image 8
Contents Stop AltoIndice Table of ContentsTable DES Matieres Safety and Operation Rules KW = 1,000 watts Spark ArresterDetermining Total Wattage Installation Operating VoltageBefore Operation Grounding the GeneratorLubrication LOW OIL SensorGenerator Features Portability KIT Installation Wheel InstallationStarting the Unit PRE-START PreparationStarting the Engine Applying LoadPeriodic Maintenance MaintenanceService and Storage Infrequent ServiceExciting the Generator Heat ShieldEngine Troubleshooting Engine Specifications Service Information Limited Warranty Powermate Corporation Airport Road Box Kearney, NEVoire la mort Règles D’OPÉRATION ET DE SécuritéPARE-ÉTINCELLES Détermination DE LA Puissance Totale NécessaireVérifier LA Tension Avant DE Mettre EN Marche Mise EN Place DE LappareilLubrification CarburantTableau de commande Prise double de 120 V, 20 a Caractéristiques DU Groupe ElectrogenePrise à verrouillage de 120/240 V, 30 a DisjoncteursLinstallation DE KIT DE Transport Installation DES RouesDemarrage DE Lappareil Préparatifs AU DémarrageBranchement DES Appareils Démarrage DU MoteurEntretien Périodique EntretienLA Bougie D’ALLUMAGE LE Type D’HUILEUsage ET Entreposage Depannage DU Moteur Caracteristiques DU Moteur Garantie Limitée Service ClienteleCommande DE Pièces DE Rechange Reglas DE Seguridad Y DE Funcionamiento SeguridadApagachispas Como Determinar EL Vataje TotalInstalacion EL Requerimiento DE VoltajeAntes DE LA Operacion Puesta a Tierra DEL GeneradorLubricacion EL Sensor DEL Nivel Bajo DE AceiteCaracteristicas DEL Generador InterruptorInstalacion DEL Juego DE Transport Instalación DE LA ManijaArranque DEL Unidad Preparacion Antes DE ArrancarArranque DEL Motor Como Aplicar UNA CargaMantenimiento Periódico MantenimientoBujia Tipo DE AceiteServicio Y Almacenamiento Excitacion DEL GeneradorEscudo DE Calor Servicio Poco FrecuenteDeteccion DE Fallos DEL Motor Especificaciones DEL Motor Servicio AL Cliente Garantía Limitada Como Pedir LOS RepuestosParts Drawing / Schema DES Pièces / Diagrama DE Piezas Parts List / Liste DES Pièces / Lista DE Piezas Part Description DescripciónPart Description Descripción QTY Powermate Corporation California and Federal Emission Control Warranty Statement