Subaru Robin Power Products EY33-2, EY44-2 manual Rope Startingengine, ENGINEwithSTARTINGMOTOR

Page 13

5-6WIRING

aJIS CB104female terminal

-eJIS CA104 male terminal

-@JIS LA 104 or LA108 plateterminal

-"""The dotted parts are not supplied with the engine.

5-6-1 ROPE STARTINGENGINE

MAGNETO

_"

/

.'-N

BUZZER

(6"- 8 W )

SPARKPLUG

 

L A M P

 

 

 

Fig. 5-6-1

(12V. 15W)

 

 

5-6-2ENGINEwithSTARTINGMOTOR

 

 

 

MAGNETO

 

LA 104

-g -:

Image 13
Contents Page Diesel FuelSystem RUN-INOPERATION TroubleshootingSPEC1FICATIONS 1MAXIMUMOUTPUT PerformanceContinuousratedoutput 3MAXIMUMTORQUEANDFUEL Consumption RATIOATMAX.OUTPUTPerformance Curve FeaturesModel EY44-2 FLYWHEELCOOLI~GFAN Lighting CoilSEl Mainbearing Cover CrankcaseCrankshaft Camshaft10GOVERNOR 15AIRCLEANERCooling LubricationMounting Installation2VENTILATION Exhaust GAS EvacuationENGINEwithSTARTINGMOTOR Rope StartingengineSpecialtools 1PREPARATIONS and Suggestions3AIRCLEANER 2BLOWER Housing and Cylinderbaffle4MUFFLER 5GOVERNORLEVER and CarburetorTappet Chamber with the Compressor 0oss Valve and Valvestemholeclearance9CYLINDERBLOCK Adjusting Tappet Clearance FigCamshaft and Tappet 12CONNECTING ROD and PistonAssembly of Connecting ROD Piston and Connecting RODPiston Ring See Fig 13CRANKSHAFT -3-13 Magneto See Fig 4MAGNETO Service InstructionsChecking Ignition Spark Governor Adjustment Operation and Construction see Figs -1-1and CarburetorFloat System Pilot System Disassembly and Reassembly3PILOT System 3ADJUSTMENT4MAIN System 5FLOATSYSTEMRUN-IN Operation of Engine after Reassembly 11 1 1 Fuel System StartingdifficultiesCompression System Engine Stops Engine MissesEngineoverheats 11-6ENGINE Backfires Through Carburetor 11-5ENGINE KnocksChecks and Corrections Size Orrection TableIo.1 +o.1 01500 250-300 18-2 EVERY20HOURS Checks and Maintenance Daily Checks and MaintenanceEvery 50 HOURS10DAY Checks and Maintenance 134EVERY 100 200 Hoursmonthly Checks and Maintenance13-6EVERY 1000 Hours Yearly Checks and Maintenance Maintenance13-5EVERY 500 600 Hourssemianual Checks 13-7PREPARATION for Long AbeyancePage Page Industrial Engines