Briggs & Stratton 71013 manual Controls, Operation, Testing the Power Management System

Page 9

Testing the Power Management System

With the generator in “AUTO“ position, turn the service disconnect feeding the transfer switch contactor to the “Off” position. The generator will start and the transfer switch will transfer to generator power.

Press the test button on the control module of the power management system. As the button is pressed, a relay will energize. Each time the button is pressed, the previous relay that was energized, will de-energize and the next relay will energize.

Press the test button once and relay B2 will energize. Press the test button again and B2 will de-energize and relay C1 will energize. This will proceed until all relays have been tested or if the test button has not been pressed for a period of 30 seconds, the test sequence will halt and the system will go back to automatic control.

To go back to utility power, turn the service disconnect feeding the transfer switch contactor to the “On” position.

Controls

There are no operator controls in this Power Management System.

Operation

When the home standby system is providing power to the transfer switch, the power management system is constantly monitoring generator power to control loads. The power management system monitors both incoming generator lines and keeps the home standby system loaded to a maximum of 85-86 percent of rated load. When the current transformers on any line start to see current reach 85-86 percent of rated load, the power management system will start shedding loads based on the lowest priority and work its way to the highest priority. When current has dropped below 85-86 percent of rated load, the power management system will start to add loads based on the highest priority first, followed by the second highest until the generator reaches 85-86 percent load or all priorities are back on line. The power management system will operate this way until the transfer switch transfers back to utility position.

The power management system waits 5 seconds between adding or shedding each load to permit the system to stabilize. When a relay is opened, the relay will stay opened for a minimum of 5 minutes or until the load can be added without putting the generator over 85-86 percent of rated load. If a large load demand is seen, the power management system will shed all loads in less than 1.5 seconds to prevent the generator from overloading. Once the demand has stabilized, the power management system will start with the highest priority, wait 5 seconds and then add the next priority. The unit will continue to do this until all loads are added or 85-86 percent of rated load is reached.

When the generator is powering loads, the A/C relays are open. When one or both of the relays sense 24VAC from the thermostat(s), the controller will shed loads B1-D2, and then will allow only one A/C relay to close. A1 has priority over A2. A2 can close when the signal for A1 has expired. When the A/C’s are being called to run, all loads are to be shed before the A/C unit can be added. Should A/C 1 call while A/C 2 is running, A/C 2 shall open, all relays would open and then A/C 1 can close. When the A/C relays open, they are to be locked out for a minimum of 5 minutes or until they receive a call to start the A/C.

7

Image 9
Contents Call Helpline 800 743-4115M-F 8-5 CTBRIGGSandSTRATTON.COM Power Management System Where to Find UsTable Of Contents Important Safety Instructions Introduction Installer ResponsibilitiesFor the Home Owner Owner Orientation Shipment Contents Installation Unpacking Mounting GuidelinesPower Wiring Interconnections You must perform the following before operating the system System SetupTesting the Power Management System ControlsOperation Wiring Decal 240VAC Electrical Appliances Electrical Load Worksheet PriorityWhen Calling the Factory MaintenanceSpecifications Relay ContactsTroubleshooting Problem Cause CorrectionSupplying power Illustrated Parts List DescriptionItems Not Illustrated Limited Warranty Reserved Llamada Línea Directa Manual de Instalación y del OperarioDónde encontrarnos Sistema de Gestión de EnergíaFecha de compra Mandos MantenimientoEspecificaciones Conserve estas instrucciones Para el Propietario Doméstico IntroduccionOrientación para el Propietario Responsabilidades del InstaladorDesempaque InstalacionPautas de Montaje Inspección al Momento de la EntregaInterconexiones de Cableado de Energía Configuración del Sistema Mandos Sistema FuncionamientoPrueba del sistema de gestión de energía eléctrica Alambrar la calcomanía Hoja de trabajo de cargas eléctricas Mantenimiento DimensionesSi Necesita Llamar a Fábrica EspecificacionesProblemo Causa Accion Reparacion de AveriasLos terminales Garantia 800 743-4115 M-F8-5 CT BRIGGSandSTRATTON.COM Guide dInstallation Et dUtilisationOù nous trouver Système de Gestion de L’alimentationDate d’achat Commandes EntretienCaractéristiques Directives de sécurité importantes Instalación FonctionnementCommandesSécurité Dépannage GarantieAu Propriétaire Résidentiel Responsabilités de lInstallateurConseils au Propriétaire Description de lÉquipementSécurité Instalación Commandes Consignes dinstallationDéballage Vérification de la LivraisonInterconnexions du câblage dalimentation Sécurité InstalaciónContrôleur dans le commutateur de transfert Commandes Fonctionnement Configuration du systèmeCommandes FonctionnementMise à lessai du système de gestion de lalimentation Décalcomanie dinstallation éléctrique Fiche technique de charge électrique Si vous Devez Communiquer avec lUsine EntretienCaractéristiques Valeur nominale desDépannage Fonctionnement Entretien Garantie