3
IMPORTANT: ONLY HAND TIGHTEN SCREWS AT THIS TIME
Position the Bottom Support Channels (long “L” shaped pieces) at the bottoms of the Posts according to the illustration below for your size deck.
Note the different sizes. (The illustrations are as viewing the deck from above with the Ladder to be installed on the left side.)
POOL
15’ END DECK
&
18’ END DECK
75”
75”
POOL
Having positioned the Bottom Support Channels in their proper locations as illustrated above, attach them to the bottom of the Posts (including the Post for the Ladder) using 1/2” Sheet Metal Screws as shown at right.
BOTTOM SUPPORT
CHANNEL
1/2” SHEET
METAL SCREW
12’ END DECK
1/2” SHEET
METAL SCREW
BOTTOM
OF POST
12’ END DECK
NOTE: On the 12’ End Deck, you must now attach 1 side of remaining 72½” Bottom Support Channel to the outside Posts nearest the pool. See right.
15’ END DECK
18’ END DECK
6