Fujitsu FD-1016AT, FD-1008AT Connecting and Removing Cables, Connecting Cables Getting started

Page 16

Connecting and Removing Cables

CAUTION

Read the Console Drawer manual before connecting the cables. Do not connect or remove the cables during a thunderstorm. When unplugging cables hold them by the plug, not the cable. Connect and remove cables in the following order.

Connecting Cables

Getting started

Then confirm that the power cable for each server is plugged into an electric o utlet and that the power is off. (Confirm connection (1))

Connect the servers

2.1When using one level KVM Switch (using only one switch device) It is possible to hook up a maximum of 8 servers.

1)Connect the first server’s keyboard, mouse connector and CRT connector with the special cable (connect (2)), next connect the switching device’s Mini D-Sub 15 pin (female) to the special connector (black). (connect (3)). Use the fixing screws to hold the Mini D-SUB15Pin in place.

2)Connect hosts 2 through 8 in the same manner.

3. Connect the console

3.1Connect the monitor cable and keyboard/mouse cable to the keyboard and mouse connectors. (connect (4)) Note: Do not connect the cables to the connectors marked with an x.

4. Connect the power cable

4.1Connect the power cable to the Console Drawer. Next, connect the power cable to an earthed power supply outlet.

When connecting the connector (Mini D-SUB 15Pin) for the monitor, use the fixing screws to securely connect the connector to the Console Drawer and server. Otherwise, images may be distorted.

13

Image 16
Contents Servis Fujitsu Component AMERICA, INC Page Contents Conventions PrefacePacking List Page Safety Precautions Important NoticesSafety Instructions Disposal Moving Console DrawerInstallation Installing the Guide Rails when using a tapped guide railInstalling tapped guide rails diagram Installing Console Drawer Names and Functions of Parts Power cable connector Connectors for servers 1 throughDIP Switches Connector for SunOFF Connecting and Removing Cables Connecting Cables Getting startedConnect the power cable Connect the serversPage Removing Cables Operation Operating the Console DrawerOpen the monitor completely Opening the LCD diagram Adjusting the Monitor Basic Adjustment Procedure DOS Mode Resolution and Refresh Rate Keyboard Operation, LED Indicators and the Reset SW Hot-Key SW operationsPointing Device Operation Selecting the Server when the Power is on Switching the ServerSelecting the Hot Key Mode OSD in a non-cascaded connection Hot Key Mode a Hot Key Mode B Page Page Switching in Hot Key Mode B Auto Scan ModeSetting/Changing Server Names Screen DetailsConstant Server Name Display Function Edid Setting Mode Storing Console Drawer Cleaning Console Drawer Clean the keyboard and pointing device with a sterile clothTechnical Specifications SpecificationOptional Accessories Sold separately Product ID RemarkTroubleshooting Symptom Cause ActionSymptom Cause Action Page Reprinting of this manual without permission is prohibited This manual is made of recycled paper