5975 Series Mass Selective Detectors
Site Preparation Guide
2
Site Preparation
Overview 16 |
|
|
Space and Weight Requirements | 20 | |
Communications Requirements | 22 | |
Electrical Requirements | 23 |
|
Air Conditioning and Environmental Requirements 28 | ||
Carrier and Reagent Gas Requirements 31 | ||
Laboratory Supply Requirements | 33 | |
Receiving the System | 37 |
|
Installation and Verification 39
This section describes how to properly prepare your site for a new MSD. Follow these instructions carefully as delays due to improper site preparation may result in loss of instrument use during the warranty period.
Agilent Technologies | 15 |