Agilent Technologies 5975 Agilent responsibility, Compliance must exist prior to installation

Page 17

Site Preparation

Complying with all local laws (codes, ordinances, and regulations) for mechanical, building, and electrical distribution systems, hazardous waste disposal, and chemical storage.

Compliance must exist prior to installation.

Providing lifting equipment adequate to unload the system from the delivery vehicle and transport it to the site where it will be installed

Providing someone to help lift the MSD onto the laboratory bench

Providing adequate secure storage space for the system until it can be installed by an Agilent Technologies representative

Agilent responsibility

An Agilent Technologies service representative will install the MSD and verify its performance. The service representative’s responsibilities are limited to:

Unpacking the MSD system and verifying that all components are present and undamaged

Connecting the carrier gas line to the instrument from the tank, regulators, and lines previously installed by the customer

Installing, connecting, and turning on MSD system components

Verifying that the system meets Agilent Technologies performance standards

Providing basic user familiarization for system hardware and software

Signing the customer up through the Response Centers for instrument and software support

Site Preparation Guide

17

Image 17
Contents Series Mass Selective Detectors U TI O N WA R N I N G Contents Power Cords General Information MSD versions Model number Product number Pump type Ionization modeInstrument Identification Many internal parts of the MSD carry dangerous voltages Important Safety WarningsMany parts are dangerously hot Electrostatic discharge is a threat to MSD electronicsWhen hydrogen gas is supplied to the instrument Hydrogen SafetyChemical Safety Information Safety and Regulatory CertificationsSymbols Sound emission declaration Electromagnetic compatibilityRecycling the Product CleaningSite Preparation Customer responsibility OverviewAgilent responsibility Compliance must exist prior to installationAnalysis Consulting services Other documentation Series MSD Troubleshooting and Maintenance ManualALS tray Space and Weight RequirementsSeries MSD Series GC Computer with monitor Product dimensions Site LAN network Communications RequirementsTelephone Voltage ranges of major components Electrical RequirementsConfiguration Measurement Nominal voltage Power configurationsSupply Outlets Power consumption Power requirementsProduct Line voltage RequiredSupply Outlets Power consumption Circuit rating Required Power plugs and cordOther electrical considerations Air Conditioning and Environmental Requirements Temperature, humidity, and altitudeTemperature Humidity relative Exhaust venting Airborne dustFume exhaust hood Purity Typical pressure range Typical flow, mL/min KPa psi Carrier and Reagent Gas RequirementsRegulators, tubing, and fittings Data system supplies Cleaning solventsLaboratory Supply Requirements Miscellaneous consumables Spare parts and consumablesPart number Ferrules Chemical ConsumablesCommonly used tools 5062-3506 Inspecting for damage Receiving the SystemDelivery and unloading Unpacking StorageVerification Installation and VerificationInstallation Sensitivity specifications Power Cords Power Cords Page Agilent Technologies