Agilent Technologies
G1978B
setup guide
Index
Install
Page 42
Index
42
Multimode Source for 6100 Series Single Quad LC/MS
Set-Up
Guide
Page 41
Page 43
Image 42
Page 41
Page 43
Contents
Set-Up Guide
U T I O N WA R N I N G
This Guide
Page
Content
Contents
Installation
Installation
Prepare to install
Install the HV control PCA and cables
From left to right G1946-80058, G1960-60802 and G1960-60856
Connecting the valve PCA to the multimode HV power supply
Connecting the Vcap and Vchamber cables to the power supply
Connecting the HV PCA to the chassis
Changing Sources
To remove the multimode source
To convert from multimode to ESI, Apci or Appi
Installation on
To convert from ESI, Apci or Appi to the multimode source
Standard spray shield and capillary cap for ESI or Apci
T E
Multimode Spray Chamber
No nebulizer on top of the multimode source
LC/MS sample tubing connected to LC/MS inlet filter
Verification
Preparation
6110 and 6120 Quad Performance Verification Summary Table
6140 Quad Performance Verification Summary, SIM Mode
20 1 pk-pk 10 1 pk-pk
Verification
6140 Quad Performance Verification Summary, Scan Mode
6130SCNESMM.M 6130SCNCIMM.M
Verification
Create and run a Multiple FIA Method Sequence
Verification
To do an autotune
Autotune report
Example of multimode verification report
Example of multimode verification report
Methods
To setup a method to use the multimode source
Be impaired and the system may catch fire
Methods
Polarity options for Signal 1 and Signal
To create a method for alternating ESI and Apci operation
Method Spray Chamber set to MM-ES+APCI
Ionization mode for Signal 1 and Signal
Index
Index
Page
G1978-90070
Top
Page
Image
Contents