IBM Nortel 10 manual Contents, Safety, Introduction, Installing and removing the GbE switch module

Page 5
Contents

Contents

Safety

. . .

.

.

v

Chapter 1. Introduction

. . .

.

.

1

Specifications

. . .

.

.

2

Related documentation

. . .

.

.

2

Notices and statements used in this document

. . .

.

.

3

Major components of the GbE switch module

. . .

.

. 4

Information panel overview

. . .

.

.

5

LEDs

. . .

.

.

6

Chapter 2. Installing and removing the GbE switch module

. . .

.

. 9

Installation guidelines

. . .

.

.

9

System reliability considerations

. . .

.

 

10

Handling static-sensitive devices

. . .

.

 

10

Installing the GbE switch module

. . .

.

 

10

Removing the GbE switch module

. . .

.

 

12

Chapter 3. Installing and removing options

. . .

.

15

Handling an XFP or SFP module

. . .

.

 

15

Installing an XFP module

. . .

.

 

16

Removing an XFP module

. . .

.

 

18

Installing an SFP module

. . .

.

 

18

Removing an SFP module

. . .

.

 

19

Chapter 4. Cabling

. . .

.

21

Connecting the serial console cable

. . .

.

 

21

Disconnecting the serial console cable

. . .

.

 

21

Connecting the CX4 module cable

. . .

.

 

21

Disconnecting a CX4 module cable

. . .

.

 

22

Connecting an XFP module cable

. . .

.

 

22

Disconnecting the XFP module cable

. . .

.

 

24

Connecting the SFP module cable

. . .

.

 

24

Disconnecting an SFP module cable

. . .

.

 

24

Chapter 5. Configuring the GbE switch module

. . .

.

25

Establishing a TCP/IP session using the management module .

. . .

. 27

Enabling management over external ports

. . .

.

 

28

Configuring the GbE switch module using Telnet

. . .

. 28

Connecting to the GbE switch module

. . .

.

 

29

Accessing the main menu

. . .

.

 

29

Configuring the GbE switch module using the serial-port interface . .

.

.

29

Configuring the GbE switch module using the switch-module Browser

 

 

Based Interface

.

.

30

© Copyright IBM Corp. 2006

iii

Image 5
Contents Module for IBM BladeCenter Installation GuideNortel 10 Gigabit Uplink Ethernet Switch Page Module for IBM BladeCenter First Edition May Safety ContentsChapter 2. Installing and removing the GbE switch module Chapter 3. Installing and removing optionsChapter 8. Solving problems Chapter 7. Parts listingAppendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004 Chapter 6. Updating the softwareSafety Antes de instalar este produto, leia as Informações sobre Segurança vi Nortel 10 Gigabit Uplink Ethernet Switch Module Installation GuideTo avoid a shock hazard Statement DANGERPage Product name and serial number label Chapter 1. IntroductionMedia access control MAC address label Media access control MAC address Specificationsv Safety Information Related documentationNotices and statements used in this document v IBM BladeCenter Management Module Command Line Reference GuideInformation panel RS232 serial console port CX4 ports Release latch Major components of the GbE switch module4 TX/RX XFP port SFP portRS232 serial port Information panel overviewCX 4 port XFP moduleTX/RX LEDsChapter 1. Introducing the Gigabit Ethernet switch module 8 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Installation guidelines Chapter 2. Installing and removing the GbE switch moduleHandling static-sensitive devices Installing the GbE switch moduleSystem reliability considerations 6. Remove the GbE switch module from its static-protective package 12 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Removing the GbE switch moduleChapter 2. Installing and removing the GbE switch module 14 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Statement Chapter 3. Installing and removing optionsHandling an XFP or SFP module DANGER Installing an XFP moduleClass 1 Laser Product Laser Klasse Laser Klass Luokan 1 Laserlaite ` Appareil A Laser de ClasseTX/RX Chapter 3. Installing and removing optionsLINK Wire tab Protective cap XFP module Installing an SFP moduleRemoving an XFP module SFP module Removing an SFP module20 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Disconnecting the serial console cable Connecting the serial console cableConnecting the CX4 module cable Chapter 4. CablingConnecting an XFP module cable Disconnecting a CX4 module cable1. Remove the protective caps from the end of the fiber-optic cable Disconnecting an SFP module cable Disconnecting the XFP module cableConnecting the SFP module cable Chapter 5. Configuring the GbE switch module 26 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide 2. From the I/O Module Tasks menu, click Configuration Establishing a TCP/IP session using the management moduleEnabling management over external ports Configuring the GbE switch module using TelnetExternal management External portsConfiguring the GbE switch module using the serial-port interface Connecting to the GbE switch moduleAccessing the main menu v 9600 baud v 8 data bits v No parity v 1 stop bit v No flow control Initial configuration Logging in to the GbE switch module Obtaining the latest level of switch software Determining the level of GbE switch module softwareChapter 6. Updating the software 3. Locate the I/O Module Firmware VPD sectionUpgrading the GbE switch module software 3. Click Power Off Modules Resetting and restarting the GbE switch module36 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Chapter 7. Parts listing 38 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Running POST Chapter 8. Solving problemsPOST errors 40 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Diagnostic indicator inFailing functional area Failure criticalityBefore you call Using the documentationChapter 9. Getting help and technical assistance Hardware service and support Software service and supportGetting help and information from the World Wide Web 42 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation GuideWhat this Warranty Covers Appendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004What this Warranty Does not Cover Part 1 - General TermsWhat IBM Will Do to Correct Problems How to Obtain Warranty ServiceYour Additional Responsibilities Exchange of a Machine or PartGoverning Law Limitation of LiabilityJurisdiction Part 2 - Country-unique TermsAMERICAS ARGENTINA Jurisdiction The following is added after the first sentenceEQUADOR COLOMBIAMEXICO PARAGUAYCANADA NORTH AMERICALimitation of Liability The following replaces item 1 of this section UNITED STATESCAMBODIA, INDONESIA, AND LAOS CAMBODIA AND LAOSArbitration The following is added under this heading HONG KONG S.A.R. OF CHINA AND MACAU S.A.R. OF CHINAMALAYSIA JAPANGoverning Law The following sentence is added to this section PHILIPPINES NEW ZEALANDPEOPLE’S REPUBLIC OF CHINA PRC THE FOLLOWING TERMS APPLY TO ALL EMEA COUNTRIES SINGAPOREEUROPE, MIDDLE EAST, AFRICA EMEA 54 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide 1 “the laws of Austria” in Albania, Armenia, Azerbaijan, BelarusJurisdiction The following exceptions are added to this section Cameroon, Cape Verde, Central African Republic, Chad, Comoros, Congo Republic, Djibouti, Democratic Republic of Congo, Equatorial Guinea, French Guiana, French Polynesia, Gabon, Gambia, Guinea, Guinea-Bissau, Ivory Coast, Lebanon, Madagascar, Mali, Mauritania, Mauritius, Mayotte, Morocco, New Caledonia, Niger, Reunion, Senegal, Seychelles, Togo, Tunisia, Vanuatu, and Wallis & Futuna all disputes arising out of this Statement of Limited Warranty or related to its violation or execution, including summary proceedings, will be settled exclusively by the Commercial Court of Paris 5 in Russia, all disputes arising out of or in relation to the interpretation, the violation, the termination, the nullity of the execution of this Statement of Limited Warranty shall be settled by Arbitration Court of Moscow 6 in South Africa, Namibia, Lesotho and Swaziland, both of us agree to submit all disputes relating to this Statement of Limited Warranty to the jurisdiction of the High Court in Johannesburg 7 in Turkey all disputes arising out of or in connection with this Statement of Limited Warranty shall be resolved by the Istanbul Central Sultanahmet Courts and Execution Directorates of Istanbul, the Republic of Turkey 8 in each of the following specified countries, any legal claim arising out of this Statement of Limited Warranty will be brought before, and settled exclusively by, the competent court of a Athens for Greece EUROPEAN UNION EU How to Obtain Warranty Service The following is added to this sectionTHE FOLLOWING TERMS APPLY TO ALL EU COUNTRIES CONSUMERSTHE FOLLOWING TERMS APPLY TO THE COUNTRY SPECIFIED AUSTRIA FRANCE AND BELGIUMThe second paragraph does not apply The following paragraphs are added to this sectionThe following sentence is added to the end of item EGYPTHUNGARY GERMANYItems for Which IBM is Not Liable What this Warranty Covers The following is added to this sectionIRELAND UNITED KINGDOM SLOVAKIASOUTH AFRICA, NAMIBIA, BOTSWANA, LESOTHO AND SWAZILAND Warranty Period Part 3 - Warranty InformationNortel 10 Gigabit Uplink Ethernet Switch Module for IBM BladeCenter Types of Warranty Service2. On-site Service 1. Customer Replaceable Unit “CRU” Service3. Courier or Depot Service 4. Customer Carry-In or Mail-In ServiceEU Country Telephone List 7. CRU and Customer Carry-In or Mail-In ServiceItaly -- +39-800-820-094 Appendix A. IBM Statement of Limited Warranty Z125-4753-08 04/200466 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Armonk, NY U.S.A Appendix B. NoticesIBM Director of Licensing IBM Corporation North Castle Drive Trademarks Appendix B. Notices Important notesProduct recycling and disposal 70 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Federal Communications Commission FCC statement Battery return programElectronic emission notices Industry Canada Class A emission compliance statement United Kingdom telecommunications safety requirementAustralia and New Zealand Class A statement European Union EMC Directive conformance statementJapanese Voluntary Control Council for Interference VCCI statement Taiwanese Class A warning statement Chinese Class A warning statement74 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Index A 76 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Index 78 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Page 1P P/N 31R1719