IBM Nortel 10 manual System reliability considerations, Handling static-sensitive devices

Page 20
System reliability considerations

System reliability considerations

To help ensure proper cooling and system reliability, make sure that:

vEach of the I/O-module bays on the rear of the BladeCenter unit has either a module or a filler module installed.

vA removed hot-swap module or blade server is replaced with another module or filler module within 1 minute of removal.

Handling static-sensitive devices

Attention: Static electricity can damage electronic devices. To avoid damage, keep static-sensitive devices in their static-protective packages until you are ready to install them.

To reduce the possibility of electrostatic discharge, observe the following precautions:

vLimit your movement. Movement can cause static electricity to build up around you.

vHandle the device carefully, holding it by its edges or its frame.

vDo not touch solder joints, pins, or exposed printed circuitry.

vDo not leave the device where others can handle and damage it.

vWhile the device is still in its static-protective package, touch it to any unpainted metal surface of the BladeCenter unit or any unpainted metal surface on any other grounded rack component for at least 2 seconds. (This drains static electricity from the package and from your body.)

vRemove the device from its package and install it directly into the BladeCenter unit without setting it down. If it is necessary to set down the device, put it back into its static-protective package. Do not place the device on the BladeCenter unit or on a metal surface.

vTake additional care when handling devices during cold weather. Heating reduces indoor humidity and increases static electricity.

Installing the GbE switch module

To install the GbE switch module, complete the following steps:

1.Read the safety information beginning on page v and “Installation guidelines” on page 9.

2.Remove the acoustic-attenuation module, if one is installed, from the rear of the BladeCenter unit. For more information, see the documentation that came with the BladeCenter unit.

3.Select an I/O-module bay in which to install the GbE switch module.

Note: For details about I/O-module bay requirements, see the BladeCenter documents for your BladeCenter unit.

10Nortel 10 Gigabit Uplink Ethernet Switch Module: Installation Guide

Image 20
Contents Module for IBM BladeCenter Installation GuideNortel 10 Gigabit Uplink Ethernet Switch Page Module for IBM BladeCenter First Edition May Contents SafetyChapter 2. Installing and removing the GbE switch module Chapter 3. Installing and removing optionsChapter 7. Parts listing Chapter 8. Solving problemsAppendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004 Chapter 6. Updating the softwareSafety vi Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Antes de instalar este produto, leia as Informações sobre SegurançaStatement DANGER To avoid a shock hazardPage Product name and serial number label Chapter 1. IntroductionMedia access control MAC address label Specifications Media access control MAC addressv Safety Information Related documentationv IBM BladeCenter Management Module Command Line Reference Guide Notices and statements used in this documentMajor components of the GbE switch module Information panel RS232 serial console port CX4 ports Release latch4 TX/RX XFP port SFP portInformation panel overview RS232 serial portCX 4 port XFP moduleLEDs TX/RXChapter 1. Introducing the Gigabit Ethernet switch module 8 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Chapter 2. Installing and removing the GbE switch module Installation guidelinesHandling static-sensitive devices Installing the GbE switch moduleSystem reliability considerations 6. Remove the GbE switch module from its static-protective package Removing the GbE switch module 12 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation GuideChapter 2. Installing and removing the GbE switch module 14 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Statement Chapter 3. Installing and removing optionsHandling an XFP or SFP module Installing an XFP module DANGERClass 1 Laser Product Laser Klasse Laser Klass Luokan 1 Laserlaite ` Appareil A Laser de ClasseTX/RX Chapter 3. Installing and removing optionsLINK Wire tab Protective cap XFP module Installing an SFP moduleRemoving an XFP module Removing an SFP module SFP module20 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Connecting the serial console cable Disconnecting the serial console cableConnecting the CX4 module cable Chapter 4. CablingDisconnecting a CX4 module cable Connecting an XFP module cable1. Remove the protective caps from the end of the fiber-optic cable Disconnecting an SFP module cable Disconnecting the XFP module cableConnecting the SFP module cable Chapter 5. Configuring the GbE switch module 26 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Establishing a TCP/IP session using the management module 2. From the I/O Module Tasks menu, click ConfigurationConfiguring the GbE switch module using Telnet Enabling management over external portsExternal management External portsConfiguring the GbE switch module using the serial-port interface Connecting to the GbE switch moduleAccessing the main menu v 9600 baud v 8 data bits v No parity v 1 stop bit v No flow control Initial configuration Logging in to the GbE switch module Determining the level of GbE switch module software Obtaining the latest level of switch softwareChapter 6. Updating the software 3. Locate the I/O Module Firmware VPD sectionUpgrading the GbE switch module software Resetting and restarting the GbE switch module 3. Click Power Off Modules36 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Chapter 7. Parts listing 38 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Running POST Chapter 8. Solving problemsPOST errors Diagnostic indicator in 40 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation GuideFailing functional area Failure criticalityBefore you call Using the documentationChapter 9. Getting help and technical assistance Software service and support Hardware service and supportGetting help and information from the World Wide Web 42 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation GuideAppendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004 What this Warranty CoversWhat this Warranty Does not Cover Part 1 - General TermsHow to Obtain Warranty Service What IBM Will Do to Correct ProblemsExchange of a Machine or Part Your Additional ResponsibilitiesLimitation of Liability Governing LawPart 2 - Country-unique Terms JurisdictionAMERICAS ARGENTINA Jurisdiction The following is added after the first sentenceCOLOMBIA EQUADORMEXICO PARAGUAYNORTH AMERICA CANADALimitation of Liability The following replaces item 1 of this section UNITED STATESCAMBODIA AND LAOS CAMBODIA, INDONESIA, AND LAOSArbitration The following is added under this heading HONG KONG S.A.R. OF CHINA AND MACAU S.A.R. OF CHINAMALAYSIA JAPANGoverning Law The following sentence is added to this section PHILIPPINES NEW ZEALANDPEOPLE’S REPUBLIC OF CHINA PRC THE FOLLOWING TERMS APPLY TO ALL EMEA COUNTRIES SINGAPOREEUROPE, MIDDLE EAST, AFRICA EMEA 54 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide 1 “the laws of Austria” in Albania, Armenia, Azerbaijan, BelarusJurisdiction The following exceptions are added to this section Cameroon, Cape Verde, Central African Republic, Chad, Comoros, Congo Republic, Djibouti, Democratic Republic of Congo, Equatorial Guinea, French Guiana, French Polynesia, Gabon, Gambia, Guinea, Guinea-Bissau, Ivory Coast, Lebanon, Madagascar, Mali, Mauritania, Mauritius, Mayotte, Morocco, New Caledonia, Niger, Reunion, Senegal, Seychelles, Togo, Tunisia, Vanuatu, and Wallis & Futuna all disputes arising out of this Statement of Limited Warranty or related to its violation or execution, including summary proceedings, will be settled exclusively by the Commercial Court of Paris 5 in Russia, all disputes arising out of or in relation to the interpretation, the violation, the termination, the nullity of the execution of this Statement of Limited Warranty shall be settled by Arbitration Court of Moscow 6 in South Africa, Namibia, Lesotho and Swaziland, both of us agree to submit all disputes relating to this Statement of Limited Warranty to the jurisdiction of the High Court in Johannesburg 7 in Turkey all disputes arising out of or in connection with this Statement of Limited Warranty shall be resolved by the Istanbul Central Sultanahmet Courts and Execution Directorates of Istanbul, the Republic of Turkey 8 in each of the following specified countries, any legal claim arising out of this Statement of Limited Warranty will be brought before, and settled exclusively by, the competent court of a Athens for Greece How to Obtain Warranty Service The following is added to this section EUROPEAN UNION EUTHE FOLLOWING TERMS APPLY TO ALL EU COUNTRIES CONSUMERSFRANCE AND BELGIUM THE FOLLOWING TERMS APPLY TO THE COUNTRY SPECIFIED AUSTRIAThe following paragraphs are added to this section The second paragraph does not applyThe following sentence is added to the end of item EGYPTGERMANY HUNGARYItems for Which IBM is Not Liable What this Warranty Covers The following is added to this sectionIRELAND UNITED KINGDOM SLOVAKIASOUTH AFRICA, NAMIBIA, BOTSWANA, LESOTHO AND SWAZILAND Part 3 - Warranty Information Warranty PeriodNortel 10 Gigabit Uplink Ethernet Switch Module for IBM BladeCenter Types of Warranty Service1. Customer Replaceable Unit “CRU” Service 2. On-site Service3. Courier or Depot Service 4. Customer Carry-In or Mail-In Service7. CRU and Customer Carry-In or Mail-In Service EU Country Telephone ListAppendix A. IBM Statement of Limited Warranty Z125-4753-08 04/2004 Italy -- +39-800-820-09466 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Armonk, NY U.S.A Appendix B. NoticesIBM Director of Licensing IBM Corporation North Castle Drive Trademarks Appendix B. Notices Important notesProduct recycling and disposal 70 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Federal Communications Commission FCC statement Battery return programElectronic emission notices United Kingdom telecommunications safety requirement Industry Canada Class A emission compliance statementAustralia and New Zealand Class A statement European Union EMC Directive conformance statementTaiwanese Class A warning statement Chinese Class A warning statement Japanese Voluntary Control Council for Interference VCCI statement74 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Index A 76 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Index 78 Nortel 10 Gigabit Uplink Ethernet Switch Module Installation Guide Page 1P P/N 31R1719