Cisco Systems 124792, 124778 Installation and Commissioning Checklist, Installation Materials

Page 30

Chapter 2 System Installation

2.1.3 Installation and Commissioning Checklist

Insulated Phillips and flathead screwdriver sets

Insulated wire & cable strippers/crimpers (for ground lug, DC cable, alarm, and GMT cable installations)

8mm socket or wrench for ground cable installation

1

2.1.3Installation and Commissioning Checklist

AC/DC system shelf mounted securely in rack

1 RU Distribution Shelf mounted securely in rack directly above the system shelf (if applicable)

AC and DC cabling meets local and national electrical code specifications

Installation in ETSI racks allows for front-to-back ventilation and the use of a ventilated door and cabinet top

System alarm cabling is installed and secure

Power cables are secure and installed correctly

Rectifiers are installed and seated correctly in the system shelf

The controller and 1 RU Distribution faceplates are installed and secure (if applicable)

System shelf rear cover is installed and secured

System powers up and all red LEDs are extinguished after a few minutes

2.1.4Installation Materials

Table 2-1and Table 2-2list the Cisco supplied installation materials that ship with the Cisco AC/DC Power System. Table 2-3lists materials that will need to be furnished at the install location.

Table 2-1

Supplied Materials for the System Shelf

 

 

 

 

Description

 

Qty

Use

 

 

 

M6 0x20mm screw (thread forming)

6

Shelf mounting screws (ETSI racks/cabinets)

 

 

 

12-24 x1/2” screw (thread forming)

6

Shelf mounting screws (ANSI, IEC racks/

 

 

 

cabinets)

 

 

 

 

M6 cage nut

 

6

Shelf mounting nut (ETSI racks/cabinets)

 

 

 

Mounting bracket 600mm ETSI rack

2

Ear mounts (ETSI racks/cabinets)

 

 

 

 

2A GMT fuse

 

2

GMT fuse panel

 

 

 

 

5A GMT fuse

 

2

GMT fuse panel

 

 

 

 

10A GMT fuse

 

2

GMT fuse panel

 

 

 

 

15A GMT fuse

 

2

GMT fuse panel

 

 

 

Standard AC plug

4

AC plugs that meet local requirements

 

 

 

 

Cable ties

 

12

Securing cables

 

 

 

 

ESD wrist strap

 

1

ESD protection

 

 

 

 

Cisco AC/DC Power System User Guide, R1.0

2-2

May 2006

Image 30
Contents Cisco AC/DC Power System User Guide Corporate HeadquartersCisco AC/DC Power System User Guide, Release N T E N T S System Operation Add Modules Contents Cisco AC/DC Power System User Guide, R1.0 Two-Inch Clearance Around Front Ventilation Opening Viii Supplied Materials for the System Shelf Tables Cisco AC/DC Power System User Guide, R1.0 Document Objectives AudienceDocument Organization Document Conventions Convention ApplicationCisco.com Where to Find Safety and Warning InformationObtaining Documentation Ordering DocumentationDocumentation Feedback Obtaining Technical AssistanceCisco Technical Support Website Submitting a Service Request Definitions of Service Request SeverityObtaining Additional Publications and Information Introduction System DescriptionSystem Shelf LCDRectifier Modules Introduction Rectifier ModulesGMT Fuses 4 1 RU Distribution ShelfSystem Configurations 1 RU Distribution ShelfGeneral Specifications From Wire Gauge AmpacityElectrical Value Mechanical Description Status & Alarms DescriptionProtection Description Environment DescriptionSafety Recommendations Compliance DescriptionInstallation Warning Operating Temperature WarningsElectrical Safety Warnings Two-Inch Clearance Around Front Ventilation OpeningIntroduction Electrical Safety Warnings May Pre-Installation Ground SymbolTools Required Installation and Commissioning Checklist Installation MaterialsDescription Qty Use Install AC/DC Power System Components Install the System Shelf Cisco AC/DC Power System Front ViewInstalling the System Shelf Install the 1 RU Distribution Shelf 1 RU Distribution Cable DressingInstall the Communications Cabling Optional Install the DC Power Cabling Optional Install the Ground Cable Installing 1 RU DC CablingInstall the Cabinet/Rack Ground Install the 1 RU Distribution Shelf Ground Install AC Power Cables 11 Installing the 1 RU Distribution Shelf GroundSystem Installation Install AC Power Cables 12 Installing the AC Cable Shelf 13 Routing AC Cables Install the Rectifiers 14 Installing a Rectifier Install Circuit Breakers 15 Removing a Rectifier Blank Faceplate16 Circuit Breaker On/Off Positions 18 Installing a Circuit Breaker System SizeInstall the Alarm Cable 19 Removing the Controller Faceplate Without LCD Alarm Designation Jumper System withInstall Load-and-Return Connections Wire Gauge Stranded ApplicationsInstall GMT Fuse Connections Install 1 RU Distribution Shelf Load Connections 23 Installing GMT CablingA2 A1 Return Load System Upgrades Small to Medium System UpgradeMedium to Large System Upgrade Small to Large System UpgradeMay Safety Component ReplacementReplace the 1 RU Distribution Shelf Removing the 1 RU DC Cable Replace the Controller Tray Removing the 1 RU Distribution ShelfRemoving the Controller Faceplate J15 terminal block J14/J13 terminal blocks Replace Circuit Breakers Circuit Breaker On/Off PositionsRemoving the 1 RU Distribution Shelf Faceplate Replace a Rectifier Removing a Circuit BreakerRemoving a Rectifier Replace GMT Fuses 10 Removing a GMT FuseSystem Commissioning General InformationAlarm Interface Board and Connections Basic Controller FunctionsRemove Modules May System Troubleshooting Tripped breaker Fuse blown Module Locations Page System Parts List Description Part NumberPage Translated Safety Warnings Statement 12-Power Supply Disconnection WarningAppendix a Translated Safety Warnings Statement 43-Jewelry Removal Warning Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Page Statement 1017-Restricted Area May Statement 1024-Ground Conductor Appendix a Translated Safety Warnings Statement 1030-Equipment Installation Statement 1033-SELV-IEC 60950 DC Power Supply Statement 1047-Overheating Prevention Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings