Cisco Systems 124792 manual Submitting a Service Request, Definitions of Service Request Severity

Page 15

About this Guide

Obtaining Technical Assistance

or model name; by tree view; or for certain products, by copying and pasting show command output. Search results show an illustration of your product with the serial number label location highlighted. Locate the serial number label on your product and record the information before placing a service call.

Submitting a Service Request

Using the online TAC Service Request Tool is the fastest way to open S3 and S4 service requests. (S3 and S4 service requests are those in which your network is minimally impaired or for which you require product information.) After you describe your situation, the TAC Service Request Tool provides recommended solutions. If your issue is not resolved using the recommended resources, your service request is assigned to a Cisco TAC engineer. The TAC Service Request Tool is located at this URL:

http://www.cisco.com/techsupport/servicerequest

For S1 or S2 service requests or if you do not have Internet access, contact the Cisco TAC by telephone. (S1 or S2 service requests are those in which your production network is down or severely degraded.) Cisco TAC engineers are assigned immediately to S1 and S2 service requests to help keep your business operations running smoothly.

To open a service request by telephone, use one of the following numbers:

Asia-Pacific: +61 2 8446 7411 (Australia: 1 800 805 227)

EMEA: +32 2 704 55 55

USA: 1 800 553-2447

For a complete list of Cisco TAC contacts, go to this URL:

http://www.cisco.com/techsupport/contacts

Definitions of Service Request Severity

To ensure that all service requests are reported in a standard format, Cisco has established severity definitions.

Severity 1 (S1)—Your network is “down,” or there is a critical impact to your business operations. You and Cisco will commit all necessary resources around the clock to resolve the situation.

Severity 2 (S2)—Operation of an existing network is severely degraded, or significant aspects of your business operation are negatively affected by inadequate performance of Cisco products. You and Cisco will commit full-time resources during normal business hours to resolve the situation.

Severity 3 (S3)—Operational performance of your network is impaired, but most business operations remain functional. You and Cisco will commit resources during normal business hours to restore service to satisfactory levels.

Severity 4 (S4)—You require information or assistance with Cisco product capabilities, installation, or configuration. There is little or no effect on your business operations.

Cisco AC/DC Power System User Guide, R1.0

May 2006

xv

Image 15
Contents Corporate Headquarters Cisco AC/DC Power System User GuideCisco AC/DC Power System User Guide, Release N T E N T S System Operation Add Modules Contents Cisco AC/DC Power System User Guide, R1.0 Two-Inch Clearance Around Front Ventilation Opening Viii Supplied Materials for the System Shelf Tables Cisco AC/DC Power System User Guide, R1.0 Document Objectives AudienceDocument Organization Convention Application Document ConventionsOrdering Documentation Where to Find Safety and Warning InformationObtaining Documentation Cisco.comDocumentation Feedback Obtaining Technical AssistanceCisco Technical Support Website Definitions of Service Request Severity Submitting a Service RequestObtaining Additional Publications and Information System Description IntroductionLCD System ShelfIntroduction Rectifier Modules Rectifier Modules4 1 RU Distribution Shelf GMT Fuses1 RU Distribution Shelf System ConfigurationsGeneral Specifications From Wire Gauge AmpacityElectrical Value Environment Description Status & Alarms DescriptionProtection Description Mechanical DescriptionCompliance Description Safety RecommendationsOperating Temperature Warnings Installation WarningTwo-Inch Clearance Around Front Ventilation Opening Electrical Safety WarningsIntroduction Electrical Safety Warnings May Pre-Installation Ground SymbolTools Required Installation and Commissioning Checklist Installation MaterialsDescription Qty Use Install AC/DC Power System Components Cisco AC/DC Power System Front View Install the System ShelfInstalling the System Shelf 1 RU Distribution Cable Dressing Install the 1 RU Distribution ShelfInstall the Communications Cabling Optional Install the DC Power Cabling Optional Installing 1 RU DC Cabling Install the Ground CableInstall the Cabinet/Rack Ground Install the 1 RU Distribution Shelf Ground 11 Installing the 1 RU Distribution Shelf Ground Install AC Power CablesSystem Installation Install AC Power Cables 12 Installing the AC Cable Shelf 13 Routing AC Cables Install the Rectifiers 14 Installing a Rectifier 15 Removing a Rectifier Blank Faceplate Install Circuit Breakers16 Circuit Breaker On/Off Positions System Size 18 Installing a Circuit BreakerInstall the Alarm Cable 19 Removing the Controller Faceplate Jumper System with Without LCD Alarm DesignationWire Gauge Stranded Applications Install Load-and-Return ConnectionsInstall GMT Fuse Connections 23 Installing GMT Cabling Install 1 RU Distribution Shelf Load ConnectionsA2 A1 Return Load Small to Medium System Upgrade System UpgradesSmall to Large System Upgrade Medium to Large System UpgradeMay Safety Component ReplacementReplace the 1 RU Distribution Shelf Removing the 1 RU DC Cable Removing the 1 RU Distribution Shelf Replace the Controller TrayRemoving the Controller Faceplate J15 terminal block J14/J13 terminal blocks Circuit Breaker On/Off Positions Replace Circuit BreakersRemoving the 1 RU Distribution Shelf Faceplate Removing a Circuit Breaker Replace a RectifierRemoving a Rectifier 10 Removing a GMT Fuse Replace GMT FusesGeneral Information System CommissioningBasic Controller Functions Alarm Interface Board and ConnectionsRemove Modules May System Troubleshooting Tripped breaker Fuse blown Module Locations Page Description Part Number System Parts ListPage Statement 12-Power Supply Disconnection Warning Translated Safety WarningsAppendix a Translated Safety Warnings Statement 43-Jewelry Removal Warning Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Page Statement 1017-Restricted Area May Statement 1024-Ground Conductor Appendix a Translated Safety Warnings Statement 1030-Equipment Installation Statement 1033-SELV-IEC 60950 DC Power Supply Statement 1047-Overheating Prevention Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings