Chapter 2 System Installation
2.2 Install AC/DC Power System Components
Table
Description |
| Qty | Use |
|
|
| |
Quick Installation Guide | 1 | Installation instructions | |
|
|
| |
System documentation | 1 | Installation, provisioning, and troubleshooting | |
|
|
|
|
Table | Supplied Materials for the 1 RU Distribution Shelf | ||
|
|
|
|
Description |
| Qty | Use |
|
|
| |
M6 0x20mm screw (thread forming) | 4 | Shelf mounting screws (ETSI racks/cabinets) | |
|
|
| |
4 | Shelf mounting screws (ANSI, IEC racks/ | ||
|
|
| cabinets) |
|
|
|
|
M6 cage nut |
| 4 | Shelf mounting nut (ETSI racks/cabinets) |
|
|
| |
Mounting bracket 600mm ETSI rack | 2 | Ear mounts (ETSI racks/cabinets) | |
|
|
| |
Quick disconnect circuit breakers | 2 | 1RU Distribution Shelf | |
|
|
|
|
Cable ties |
| 4 | Securing cables |
|
|
|
|
ESD wrist strap |
| 1 | ESD protection |
|
|
| |
Quick Installation Guide | 1 | Installation instructions | |
|
|
|
|
Table |
| ||
|
|
|
|
Description |
| Qty | Use |
|
|
| |
6AWG (16mm²) grounding cable | 1 | system shelf grounding | |
|
|
| |
6AWG (16mm²) grounding cable | 1 | 1RU Distribution grounding (if applicable) | |
|
|
| |
10 to 8 AWG (6 to 10mm²) cables | <8 | DC load breaker connections | |
|
|
| |
22 AWG (0.34mm²) cables | n/a | 2A GMT fuse cabling | |
|
|
| |
18 AWG (0.75mm²) cables | n/a | 5A GMT fuse cabling | |
|
|
| |
14 AWG (2.5mm²) cables | n/a | 10/15A GMT fuse cabling | |
|
|
| |
26 to 22AWG (0.14mm²- 0.34mm²) | 4 | Alarm cabling | |
cables |
|
|
|
|
|
| |
UL Listed | 2 | Ground cable installation | |
5/8in. |
|
| |
Panduit LCD6 |
|
| |
|
|
|
|
2.2 Install AC/DC Power System Components
The following sections contain instructions for installing components. Figure
Cisco AC/DC Power System User Guide, R1.0
May 2006 |