Cisco Systems 124778, 124792, 159330 manual Appendix a Translated Safety Warnings

Page 82

Appendix A Translated Safety Warnings

Statement 1006—Chassis Warning for Rack-Mounting and Servicing

Warning To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:

This unit should be mounted at the bottom of the rack if it is the only unit in the rack.

When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.

If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack. Statement 1006

Waarschuwing Om lichamelijk letsel te voorkomen wanneer u dit toestel in een rek monteert of het daar een servicebeurt geeft, moet u speciale voorzorgsmaatregelen nemen om ervoor te zorgen dat het toestel stabiel blijft. De onderstaande richtlijnen worden verstrekt om uw veiligheid te verzekeren:

Dit toestel dient onderaan in het rek gemonteerd te worden als het toestel het enige in het rek is.

Wanneer u dit toestel in een gedeeltelijk gevuld rek monteert, dient u het rek van onderen naar boven te laden met het zwaarste onderdeel onderaan in het rek.

Als het rek voorzien is van stabiliseringshulpmiddelen, dient u de stabilisatoren te monteren voordat u het toestel in het rek monteert of het daar een servicebeurt geeft.

Cisco AC/DC Power System User Guide, R1.0

A-4

May 2006

Image 82
Contents Cisco AC/DC Power System User Guide Corporate HeadquartersCisco AC/DC Power System User Guide, Release N T E N T S System Operation Add Modules Contents Cisco AC/DC Power System User Guide, R1.0 Two-Inch Clearance Around Front Ventilation Opening Viii Supplied Materials for the System Shelf Tables Cisco AC/DC Power System User Guide, R1.0 Audience Document ObjectivesDocument Organization Document Conventions Convention ApplicationCisco.com Where to Find Safety and Warning InformationObtaining Documentation Ordering DocumentationObtaining Technical Assistance Documentation FeedbackCisco Technical Support Website Submitting a Service Request Definitions of Service Request SeverityObtaining Additional Publications and Information Introduction System DescriptionSystem Shelf LCDRectifier Modules Introduction Rectifier ModulesGMT Fuses 4 1 RU Distribution ShelfSystem Configurations 1 RU Distribution ShelfFrom Wire Gauge Ampacity General SpecificationsElectrical Value Mechanical Description Status & Alarms DescriptionProtection Description Environment DescriptionSafety Recommendations Compliance DescriptionInstallation Warning Operating Temperature WarningsElectrical Safety Warnings Two-Inch Clearance Around Front Ventilation OpeningIntroduction Electrical Safety Warnings May Ground Symbol Pre-InstallationTools Required Installation Materials Installation and Commissioning ChecklistDescription Qty Use Install AC/DC Power System Components Install the System Shelf Cisco AC/DC Power System Front ViewInstalling the System Shelf Install the 1 RU Distribution Shelf 1 RU Distribution Cable DressingInstall the Communications Cabling Optional Install the DC Power Cabling Optional Install the Ground Cable Installing 1 RU DC CablingInstall the Cabinet/Rack Ground Install the 1 RU Distribution Shelf Ground Install AC Power Cables 11 Installing the 1 RU Distribution Shelf GroundSystem Installation Install AC Power Cables 12 Installing the AC Cable Shelf 13 Routing AC Cables Install the Rectifiers 14 Installing a Rectifier Install Circuit Breakers 15 Removing a Rectifier Blank Faceplate16 Circuit Breaker On/Off Positions 18 Installing a Circuit Breaker System SizeInstall the Alarm Cable 19 Removing the Controller Faceplate Without LCD Alarm Designation Jumper System withInstall Load-and-Return Connections Wire Gauge Stranded ApplicationsInstall GMT Fuse Connections Install 1 RU Distribution Shelf Load Connections 23 Installing GMT CablingA2 A1 Return Load System Upgrades Small to Medium System UpgradeMedium to Large System Upgrade Small to Large System UpgradeMay Component Replacement SafetyReplace the 1 RU Distribution Shelf Removing the 1 RU DC Cable Replace the Controller Tray Removing the 1 RU Distribution ShelfRemoving the Controller Faceplate J15 terminal block J14/J13 terminal blocks Replace Circuit Breakers Circuit Breaker On/Off PositionsRemoving the 1 RU Distribution Shelf Faceplate Replace a Rectifier Removing a Circuit BreakerRemoving a Rectifier Replace GMT Fuses 10 Removing a GMT FuseSystem Commissioning General InformationAlarm Interface Board and Connections Basic Controller FunctionsRemove Modules May System Troubleshooting Tripped breaker Fuse blown Module Locations Page System Parts List Description Part NumberPage Translated Safety Warnings Statement 12-Power Supply Disconnection WarningAppendix a Translated Safety Warnings Statement 43-Jewelry Removal Warning Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings Page Statement 1017-Restricted Area May Statement 1024-Ground Conductor Appendix a Translated Safety Warnings Statement 1030-Equipment Installation Statement 1033-SELV-IEC 60950 DC Power Supply Statement 1047-Overheating Prevention Appendix a Translated Safety Warnings Appendix a Translated Safety Warnings