Chapter 2 System Installation
2.5 Install
Figure 2-21 Alarm Board Connection Points
| 124764 |
Step 7 | Reinsert the terminal block (Figure |
Step 8 | Alarm cables run from the rear of the system shelf (leaving enough of a service loop to allow the drawer |
| to slide out) through the access window (between the controller drawer and the GMT drawer area) |
| (Figure |
Step 9 | Secure the alarm cables using the provided strain relief |
|
|
2.5 Install Load-and-Return Connections
The following section contains information on installing different distribution options available for the power system. Table
Table
Wire Gauge Stranded | Applications |
|
|
10 to 8 AWG | Breaker Load |
(6mm² to 10mm²) | (up to 30A) |
| |
|
|
22 AWG (0.34mm²) | 2A GMT Fuses |
|
|
18 AWG (0.75mm²) | 5A GMT Fuses |
|
|
Cisco AC/DC Power System User Guide, R1.0
May 2006 |
| |
|