Contents
2.1.4 | Installation Materials |
|
| ||
2.2 Install AC/DC Power System Components |
| ||||
2.2.1 | Install the System Shelf |
|
| ||
2.2.2 | Install the 1 RU Distribution Shelf |
| |||
2.2.2.1 | Install the Communications Cabling (Optional) | ||||
2.2.2.2 | Install the DC Power Cabling (Optional) | ||||
2.2.3 | Install the Ground Cable |
|
| ||
2.2.3.1 | Install the Cabinet/Rack Ground |
| |||
2.2.3.2 | Install the System Shelf Ground |
| |||
2.2.3.3 | Install the 1 RU Distribution Shelf Ground |
|
| 2.3 | Install AC Power Cables |
|
|
|
| |||
|
|
| 2.3.1 | Install the Rectifiers |
|
|
| |||
|
| 2.4 | Install Circuit Breakers |
|
|
| ||||
|
|
| 2.4.1 | Install the Alarm Cable |
|
| ||||
|
| 2.5 | Install |
| ||||||
|
|
| 2.5.1 | Install GMT Fuse Connections |
| |||||
|
|
| 2.5.2 | Install 1 RU Distribution Shelf Load Connections | ||||||
|
| 2.6 | System Upgrades |
|
|
|
|
| ||
|
|
| 2.6.1 GMT Fuses |
|
|
|
|
| ||
|
|
| 2.6.2 Small to Medium System Upgrade | |||||||
|
|
| 2.6.3 Medium to Large System Upgrade | |||||||
|
|
| 2.6.4 Small to Large System Upgrade | |||||||
|
| Component Replacement |
|
|
|
|
|
| ||
C H A P T E R | 3 |
|
|
|
|
| ||||
|
| 3.1 | Safety |
|
|
|
|
|
| |
|
| 3.2 | Component Replacement |
|
|
|
| |||
|
|
| 3.2.1 | Replace the 1 RU Distribution Shelf | ||||||
|
|
| 3.2.2 | Replace the Controller Tray |
| |||||
|
|
| 3.2.3 | Replace Circuit Breakers |
|
| ||||
|
|
| 3.2.4 | Replace a Rectifier |
|
|
|
| ||
|
|
| 3.2.5 Replace GMT Fuses |
|
|
| ||||
|
| System Operation |
|
|
|
|
|
| ||
C H A P T E R | 4 |
|
|
|
|
|
| |||
|
| 4.1 | System Commissioning |
|
|
| ||||
|
| 4.2 | General Information |
|
|
|
| |||
|
|
| 4.2.1 | Alarm Interface Board and Connections | ||||||
|
|
| 4.2.2 | Basic Controller Functions |
|
|
|
|
| 4.2.2.1 Start the Controller |
| |
|
|
| Cisco AC/DC Power System User Guide, R1.0 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| iv |
|
| May 2006 |
|
|
|
|
|