Chapter 2: Server Installation
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your
2-2 Unpacking the System
You should inspect the box the
Decide on a suitable location for the rack unit that will hold the
2-3 Preparing for Setup
The box the
Choosing a Setup Location
•Leave enough clearance in front of the rack to enable you to open the front door completely (~25 inches).