The 24, 100 and 125VDC options are particularly useful in the Industrial environment, where it is common for facilities to operate on 24VDC or 125VDC power. The 100 and 125VDC options are mainly used in power utilities, such as electrical substations, electrical generating plants, etc. The 24VDC applications are mainly in the Industrial environment, such as factory floor, HVAC equipment, military equipment, etc.
B4.0 INSTALLATION
This section describes the installation of the
_ GND +
ON |
OFF
Figure B4.1: -48VDC Terminal Block on Magnum Quad-Series Switches -48VDC
In this picture, the
The actual connection procedure is very straightforward. Simply connect the leads to the Magnum unit, beginning with ground. Ensure that each lead is securely tightened.
Note: The GND should be hooked up first. The
Before connecting hot lines to the Terminal Block of
An
B4.1 UL Requirements
1.Minimum 14 AWG cable for connection to a Centralized DC power source.
2.Fastening torque of the lugs on the terminal block: 9 inch pound max.
3.Centralized DC Power Source cable securement, use at least four cable ties to secure the cable to the rack at least 4 inches apart with the first one located within 6 inches of the terminal block.
B5.0 OPERATION
Operation of the Magnum