GE Energy
2.2Required Tools
Before beginning the installation procedures, have the following tools and equipment available:
•Ethernet cable(s)
•Flathead screwdriver with 0.6 mm by 3.5 mm blade (for terminal block wiring)
•Flathead screwdriver with 0.3 mm by 2.5 mm blade (for removing and installing the adapter cards and changing switch positions)
•#1 Phillip screwdriver (for power terminal block wiring and adapter card removal)
•#2 Phillip screwdriver (for rack mounting the unit)
•
•Wire cutters
•Wire strippers
•
•6 fork connectors, Panduit part number
•1 ring connector, Panduit part number
•Approved network settings for the device (default
Subnet Mask: 255.255.255.0)
•
20