Enterasys Networks A2H124-24P manual Important Considerations About Using Clear Config in a Stack

Page 41

Configuring Switches in a Stack

3.Once the desired master switch has been selected, the current configuration will be saved and the stack will automatically reset. You must now move the console cable to the new management unit.

4.Stack members other than the management unit will only identify their unit number through their console port.

5.Persistent data on all stack units can be cleared along with the current configuration using the clear config all as described in the SecureStack A2 Configuration Guide.

Adding a New Switch to an Existing Stack

Use the following procedure to install a new switch to an existing stack configuration. This procedure assumes that the new switch being added has a clean configuration from manufacturing and is running the same firmware image version as other switches in the stack.

1.Ensure that power is off on the new switch being installed.

2.Use one of the following methods to complete the stack cable connections:

If the running stack uses a daisy chain topology, make the stack cable connections from the bottom of the stack to the new switch (that is, STACK DOWN port from the bottom switch of the running stack to the STACK UP port on the new switch).

If the running stack uses a closed loop configuration, break the loop and make the stack cable connections to the new switch to close the loop.

3.Apply power to the new switch.

Important Considerations About Using Clear Config in a Stack

When using the clear config command (as described in the SecureStack A2 Configuration Guide) to clear configuration parameters in a stack, it is important to remember the following:

Use clear config to clear config parameters without clearing stack switch IDs. This command WILL NOT clear stack parameters and avoids the process of re-numbering the stack.

Use clear config all when it is necessary to clear all config parameters, including stack switch IDs and switch priority values.

SecureStack A2 PoE Installation Guide 3-11

Image 41
Contents SecureStack A2 Page Page Regulatory Compliance Information Electromagnetic Compatibility EMC Page Vcci Notice Declaration of Conformity Enterasys NETWORKS, INC Firmware License Agreement Viii Page Page Contents Troubleshooting Figures MGBIC-08 Who Should Use This Guide About This GuideRelated Documents How to Use This GuideFollowing conventions are used in this guide Conventions Used in This GuideConventions Used in This Guide Xviii About This Guide Introduction A2H124-24P and A2H124-48P OverviewBack A2H124-24P Stackable SwitchStack Connections PoE Power over Ethernet SupportRedundant Power Supply Capability Description of Mini-GBICs Power Device Classifications UsageConnectivity Switch Configuration Using CLI Commands Switch Configuration Using WebViewManagement Standards CompatibilityGetting Help Lanview Diagnostic LEDsGetting Help Introduction 10BASE-T Network Network Requirements1000BASE-T Network 100BASE-TX Network1000BASE-FX Network Hardware Installation Unpacking the Switch Considerations Prior to InstallationContents of Switch Carton Required ToolsInstalling the Rubber Feet Installing the Switch on a Flat SurfaceChassis Bottom, Rubber Feet Placement Area Guidelines for Switch Installation on Flat Surface Guidelines for Flat Surface InstallationAttaching Brackets and Installing in Rack Rack Mounting the SwitchGuidelines for Rackmount Installation Fastening the Switch to the Rack Connecting Stacking CablesStacking Cable Connections About SecureStack A2 Switch Operation in a Stack Configuring Switches in a StackInstalling a New Stackable System of Up to Eight Switches Recommended Procedures for New and Existing StacksImportant Considerations About Using Clear Config in a Stack AC Power Connecting AC and PoE PowerAccessing the RPS connector C2RPS-PoE Redundant Power SystemStack Initialization Overview Connecting to Console Port for Local ManagementDB9 Male Console Port Pinout Assignments What Is NeededConnecting an IBM PC or Compatible Connecting to an IBM or Compatible Device10 Connecting a VT Series Terminal Connecting to a VT Series Terminal11 Connecting to a Modem Connecting to a ModemConnecting UTP Cables Connecting to the Network12 Connecting a UTP Cable Segment to RJ45 Port 13 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX Installing Optional Mini-GBICs Preparation 17 Mini-GBIC with RJ45 Connector 18 Mini-GBIC with MT-RJ Connector Removing the Mini-GBIC 19 Mini-GBIC with LC ConnectorConnecting Fiber-Optic Cables to MT-RJ Ports Installing Optional Mini-GBICs A2H124-24P Connecting Fiber-Optic Cables to LC Ports 21 Cable Connection to LC Fiber-Optic Connectors Initial Logon to Switch Management Completing the InstallationTroubleshooting Lanview LEDs of A2H124-24P Using LanviewColor State Recommended Action Lanview LEDsDown RPS LED Configuration Guide for proper setup Troubleshooting ChecklistConfiguration Guide for the IP address Reset Password Switch Using the Reset Password SwitchUsing the Reset Password Switch Troubleshooting Table A-1 A2H124-24P Switch Specifications Switch SpecificationsEnvironmental PhysicalTable A-2 A2H124-48P Switch Specifications Gigabit Ethernet Specifications Mini-GBIC Input/Output SpecificationsMGBIC-LC01/MGBIC-MT01 Specifications 1000BASE-SX Table A-3 Mini-GBIC Input/Output Port SpecificationsMGBIC-LC03 Specifications 1000BASE-SX MGBIC-08 Specifications 1000BASE-ELX MGBIC-LC09 Specifications 1000BASE-LXTable A-10 MGBIC-08 Optical Specifications 10 µm SMF Table A-11 MGBIC-08 Operating Range 1550 nmConsole Port Pinout Assignments MGBIC-02 Specifications 1000BASE-TTable A-12 MGBIC-02 Specifications Table A-13 Compliance Standards Regulatory Compliance Regulatory ComplianceIndex Pinout assignments console port A-7