Eaton Electrical BladeUPS Bar manual Bar Base Installation

Page 14

INSTALLATION

NOTE Verify that the bar is secure as shown in Figure 4. The sheetmetal at the base of the bar should be below the tab on the wireway floor.

12.Secure the bar to the wireway with three M6×12 hex bolts. Install the bolts from the front of the rack. See Figure 5. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).

13.Reinstall the base bracket removed in Step 10. Install the bolts from the front of the rack. See Figure 5. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).

NOTE Do not change the original orientation of the base bracket. Verify that the threaded holes mount to the rack, not to the bar.

Base Bracket

M6×12 Hex Bolts (3 places)

Rear of Rack

Front of Rack

Figure 5. Bar Base Installation

10

EATON Powerware® BladeUPS® Bar Installation Guide S 164201723 Rev P01

Image 14
Contents Powerware BladeUPS Bar Installation Guide Special Symbols Table of Contents Table of Contents Chapter Introduction Consignes DE Sécurité Importantes Conserver CES Instructions Wichtige Sicherheitsanweisungen Aufbewaren Viktiga Säkerhetsföreskrifter Spara Dessa Föreskrifter Chapter Installation Checking the Package Contents U T I O N Wireway Installation Ferrite and Bar Placement Bar Base Installation Bar Bracket Installation Wireway Tab Attachment Wireway Terminal Block Housing Installation Wireway Access Cover Installation Front Cover Mounting Panel Installation Snap the two front covers into place, as shown in Figure Chapter Specifications Specifications Service and Support Service and Support Page Page Page 164201723P01