INSTALLATION

22.Snap the two front covers into place, as shown in Figure 12.

Front Covers (2 pieces)

Figure 12. Front Cover Installation

16

EATON Powerware® BladeUPS® Bar Installation Guide S 164201723 Rev P01

Image 20
Contents Powerware BladeUPS Bar Installation Guide Special Symbols Table of Contents Table of Contents Chapter Introduction Consignes DE Sécurité Importantes Conserver CES Instructions Wichtige Sicherheitsanweisungen Aufbewaren Viktiga Säkerhetsföreskrifter Spara Dessa Föreskrifter Chapter Installation Checking the Package Contents U T I O N Wireway Installation Ferrite and Bar Placement Bar Base Installation Bar Bracket Installation Wireway Tab Attachment Wireway Terminal Block Housing Installation Wireway Access Cover Installation Front Cover Mounting Panel Installation Snap the two front covers into place, as shown in Figure Chapter Specifications Specifications Service and Support Service and Support Page Page Page 164201723P01