Eaton Electrical BladeUPS Bar manual Front Cover Mounting Panel Installation

Page 19

INSTALLATION

21.Using four M5×16 hex bolts and four M5 cage nuts, secure the front cover mounting panel to the front of the rack. Verify that the bent edge of the panel is at the top. See Figure 11.

Install the lower bolts and cage nuts into the second holes from the bottom of the rack frame. Torque the bolts to 5.1 ± 0.8 Nm

(45 ± 7 lb in).

Bent Edge of Panel

M5×16 Hex Bolts and M5 Cage Nuts (4 places)

Front Cover

Mounting Panel

Front of Rack

Figure 11. Front Cover Mounting Panel Installation

EATON Powerware® BladeUPS® Bar Installation Guide S 164201723 Rev P01

15

Image 19
Contents Powerware BladeUPS Bar Installation Guide Special Symbols Table of Contents Table of Contents Chapter Introduction Consignes DE Sécurité Importantes Conserver CES Instructions Wichtige Sicherheitsanweisungen Aufbewaren Viktiga Säkerhetsföreskrifter Spara Dessa Föreskrifter Chapter Installation Checking the Package Contents U T I O N Wireway Installation Ferrite and Bar Placement Bar Base Installation Bar Bracket Installation Wireway Tab Attachment Wireway Terminal Block Housing Installation Wireway Access Cover Installation Front Cover Mounting Panel Installation Snap the two front covers into place, as shown in Figure Chapter Specifications Specifications Service and Support Service and Support Page Page Page 164201723P01