Eaton Electrical BladeUPS Bar manual Wireway Tab Attachment

Page 16

INSTALLATION

16.Install two M4×8 pan-head screws into the tab on the wireway floor, securing the base of the bar to the wireway. See Figure 7. Torque the screws to 1.7 ± 0.2 Nm (15 ± 2 lb in).

Rear of Rack

M4×8 Pan-Head Screws (2 places)

Wireway Floor Tab

(above bar base sheetmetal)

Figure 7. Wireway Tab Attachment

12

EATON Powerware® BladeUPS® Bar Installation Guide S 164201723 Rev P01

Image 16
Contents Powerware BladeUPS Bar Installation Guide Special Symbols Table of Contents Table of Contents Chapter Introduction Consignes DE Sécurité Importantes Conserver CES Instructions Wichtige Sicherheitsanweisungen Aufbewaren Viktiga Säkerhetsföreskrifter Spara Dessa Föreskrifter Chapter Installation Checking the Package Contents U T I O N Wireway Installation Ferrite and Bar Placement Bar Base Installation Bar Bracket Installation Wireway Tab Attachment Wireway Terminal Block Housing Installation Wireway Access Cover Installation Front Cover Mounting Panel Installation Snap the two front covers into place, as shown in Figure Chapter Specifications Specifications Service and Support Service and Support Page Page Page 164201723P01