Eaton Electrical BladeUPS Bar manual Bar Bracket Installation

Page 15

INSTALLATION

14.Secure the base bracket to the rack with three M6×12 hex bolts. Install the bolts from the rear of the rack.

Use a large screwdriver or crowbar to lift the bar in place to align the holes in the base bracket with the holes in the rack.

Install the lowest bolt in position 2, then use positions 9 and 15. Verify that the base bracket stud aligns completely with the rack hole below the top bolt (position 14). See Figure 6. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).

15.Install two M6×12 hex bolts in each of the bar’s three mounting brackets, securing the length of the bar to the rack. See Figure 6. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).

NOTE Loosening the mounting brackets slightly may allow easier alignment to the vertical rail of the rack. Retighten the mounting brackets when alignment is complete.

M6×12 Hex Bolts (2 places) per Mounting Bracket (3 places)

NOTE One mounting bracket shown.

Base Bracket Stud (below top bolt)

M6×12 Hex Bolts through Rack to Base Bracket

(3 places)

Rear of Rack

Figure 6. Bar Bracket Installation

EATON Powerware® BladeUPS® Bar Installation Guide S 164201723 Rev P01

11

Image 15
Contents Powerware BladeUPS Bar Installation Guide Special Symbols Table of Contents Table of Contents Chapter Introduction Consignes DE Sécurité Importantes Conserver CES Instructions Wichtige Sicherheitsanweisungen Aufbewaren Viktiga Säkerhetsföreskrifter Spara Dessa Föreskrifter Chapter Installation Checking the Package Contents U T I O N Wireway Installation Ferrite and Bar Placement Bar Base Installation Bar Bracket Installation Wireway Tab Attachment Wireway Terminal Block Housing Installation Wireway Access Cover Installation Front Cover Mounting Panel Installation Snap the two front covers into place, as shown in Figure Chapter Specifications Specifications Service and Support Service and Support Page Page Page 164201723P01