Chapter 2 | Installation |
This section explains:
SEquipment inspection
SBladeUPS Bar 60 setup and installation
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping cartons and packing materials for the carrier or place of purchase and file a claim for shipping damage. If you discover damage after acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of receipt of the equipment; 2) Send a copy of the damage claim within 15 days to your service representative.
NOTE Check the battery recharge date on the shipping carton label. If the date has expired and the batteries were never recharged, do not use the UPS. Contact your service representative.
Setup
The BladeUPS Bar 60 comes with all hardware required for installation in a standard EIA or JIS rack with square and round mounting holes.
Tools Required
To assemble the components, the following tools may be needed:
STorque wrench with the following attachments:
-Hex socket size 10 mm for M6 hex bolt
-Hex socket size 8 mm for M5 hex bolt
STorque driver with a Pozidriv® #2 for Pozidriv M4 screw
SLarge screwdriver or crowbar for lifting the bar in place
SPliers for installing cage nuts
EATON Powerware® BladeUPS® Bar Installation Guide S 164201723 Rev P01 | 5 |