Carrier Access 3200 quick start Tray Slide

Page 9

Quick Start

Installation

4. Place the Adit on the Tray Slide and attach with 4 screws removed in step 2.

screws

screws

Tray Slide

5. Slide the assembled piece (Adit 3000 and Tray Slide) onto the installed Rack Mounting Tray.

6. Secure the Tray Slide to the Rack Mounting Tray with the attached screws on the Tray Slide.

Adit 3200 - Release 1.6

9

Image 9
Contents Adit Page Quick Start Guide Electrostatic Discharge ESD Precautions Installation EnvironmentUnpacking and Inspection Installation User SafetyCompliant Installation Wall Mounting To rack mount the Adit 3000, follow the instructions below Rack Mounting Optional FeatureTray Slide Adit 3104, 3200, 3300 and 3400 Battery Backup Chassis Overview FrontBack Front of Adit Interface ConnectorsBack of Adit Grounding the UnitBattery Connection PowerTo connect AC power To connect -48 VDC powerDirection Description RS-232 Craft Port Female DB-9DS1/E1 Connection Ports Pin Name DescriptionState Description 10/100Base-TX Ethernet Reset ButtonAlarm/Status LEDs Command Description To access the management consoleWeb-Based Management #show interface ethernet 2 Eth WANSet the New-line/Transmit value CR+LF Setting up a CLI ConnectionLog Adit 3200 show version Key Enabled Software FeaturesSetup Adit 3200 for access via Web-Browser Basic ConfigurationSelect Restore Defaults Restore Factory DefaultsModify Default Admin User Quick Start Web-browser Configure Ethernet WAN InterfaceSelect Apply to apply the new settings Set Network to WAN Configure Serial 1 as WAN