Baldor Resolver to Digital Expansion Board, EXB009A01 manual Switch and Terminal Locations

Page 25

Figure 4-1 Switch and Terminal Locations

All switches

shown in OFF position.

DIP Switch

ON OFF

1 2 3 4 5

Side View

51 52 53 54 55 56

J1

Terminal tightening torque is 7 lb-in (0.8 Nm) maximum.

4-4 Setup

Image 25
Contents MN1313 Installation and Operating ManualTable of Contents Hardware Setup Connections Introduction Section General InformationGroup 2 Board Name Limited Warranty Safety Notice General Information Section Expansion Board Description SpecificationsResolver to Digital interface Maximum Motor Speed / Resolver Speed Board Installation Section Installation15HP Size a and B Controls Single Expansion Board InstallationSingle Expansion Board Installation Dual Expansion Board Installation Dual Expansion Board Installation 15HP Size C and Larger AC Controls Expansion Board Motor Control Board Dual Expansion Board Installation Dual Expansion Board Installation For 19H and 20H SCR DC Controls SCR DC ControlsSCR DC Controls Installation Feedback Module Identification Main Control Board Section Hardware SetupFeedback Module Removal Procedure Connections Switch and Terminal Locations Resolver Connections Switch SettingsSetup Configure Control Software Section Software SetupSeries 18H and 22H Vector Controls Series 19H and 20H DC SCR ControlsSoftware  Baldor Electric Company MN1313 98 C&J2500 Box Fort Smith, AR 72902±2400 501 646±4711 Fax 501 648±5792