Vanguard Managed Solutions 6500 PLUS Installing Nodes in Modulus Enclosures, Additional

Page 36

Installing Nodes in Modulus Enclosures

Installing Nodes in Modulus Enclosures

Introduction

Installing 6500PLUS cards into Modulus enclosures is the same as installing any other

 

 

type of Modulus product card.

Additional

 

For general information on setting up Modulus 8/18 enclosures, attaching product

Information

backplanes, inserting cards, and attaching front and rear filler panels to the

 

 

enclosures, refer to the Modulus Planning and Installation Guide . For general

 

 

information about Modulus 9/21 enclosures, see the Modulus 9 and 21 Installation

 

 

and Operation Guide.

 

 

The following sections contain Modulus information specific to 6500PLUS products,

 

 

including multi-processor node information, TRIM card installation, and grounding

 

 

strap installation.

 

 

 

2-28

Installation

Image 36
Contents Vanguard Managed Solutions Restricted Rights Notification for U.S. Government Users Restricted Rights LegendProprietary Material Radio Frequency Interference RegulationsPage Contents Contents About This Manual OverviewThis Chapter Describes Mise en garde LevelChapter Software Features FeaturesProtocols Hardware Card TypesProcessor Cards Support CardsEnclosures and Backplanes StandaloneEnclosure Supports Other VanguardMSProducts Types of Modulus6500PLUS Processor Cards Configurations 6525PLUS NetworkConcentrator PortPlus Processor Card Front Panel Hardware 6500PLUS Auxiliary Processor Cards 6500PLUS Asynchronous and Universal I/O Cards AIO CardUIO Card Card Type Works with Port Types Split SpeedPlus Universal I/O or Asynchronous I/O Card Front Panel 6500PLUS Network Storage Option Card NSO CardPlus Network Storage Option Card 6500PLUS Token Ring Interface Module Option Token Ring Interface Module Trim CardHardware 6500PLUS Integral DSU HardwareComponents DSU InterfacePage Installation Overview ChapterInstalling Standalone Units UnpackingSite Preparation ExampleInstallation ProcedureStep Action Description/Result Rear ViewReplacing Processor Cards in Standalone Enclosures Step ActionRemove the Standalone Enclosure Door Bottom of Standalone Enclosure Using Screwdriver on Locking Tabs Locking TabsReplacement Card Plus Processor Card with Retaining ScrewStep Action Installing Nodes in Modulus Enclosures AdditionalInformation Multiprocessor Nodes MultiprocessorNode Example OperationReplacing Master Processor of Multi-Processor Node Action Result/DescriptionInstalling Nodes in Modulus Enclosures When To Add Another Processor with Flash Before You Begin Adding a Secondary 6500PLUS Processor with FlashStep Action Result/Description Select Enable Flash MaintainingCurrent Software RevisionUpgrading with Software From the New Processor Card Select Copy Software to FlashInstalling/Replacing Processor Cards Modulus 8/18Requirements for Installing a Trim Card Product Description CodeTrim Card Rear Filler Panel for Modulus 8/18 Enclosures Guidelines for Installing a Trim Card in a Modulus 8/18 Trim Card Spacing in a Modulus 18 Enclosure 10. Trim Card Rear Filler Panel for Modulus 9/21 Enclosures Installing Nodes in Modulus Enclosures 11. Trim Card In Left-most Position of Modulus 21 Enclosure Between Two Backplanes EnclosurePlus Installing Nodes in Modulus Enclosures Installing and Connecting a Trim Card Attaching a Trim CardInstalling Connecting a Trim CardAttaching CablesRemoving/Replacing Trim Cards Before RemovingTrim Cards TRIM/Processor CardPreparing Modulus Enclosures for RFI Suppression Modulus 18 withInstalling RFI SuppressionScreen Modulus 18 RFINo Trim Card 15. RFI Suppression Straps Modulus 18 No Trim CardModulus 21 RFI SuppressionBar Starting Up the Node Node StartupCtp CR Replacing Processor Card Components Processor CardReplacing DIMs Removal New DIM19. Jumpers on the Port Interface Pins Jumpers20. Installing Jumpers on the Port Interface Pins Installing SIMMs Guidelines21. Simm Installation Replacing Flash Modules 22. Flash Module Installation Replacing ID Modules ModuleReplacing Prom Chips ChipsReplacing the Cmem Chip DSU DIM Installation Installing the DSUControl Terminal Configuring the 6500PLUS for DSU Operation DSU Input and Output Signaling Input SignalsOutput Signals 24. Diagnostics Menu Loopback OptionsTroubleshooting DSU DIM Installation TroubleshootingDSU DIM FCC Information Type of InterfaceFacility Interface DSU DIM Installation Power-Up Verification CheckingLights Event Result/DescriptionPower-Up DiagnosticsSetting Node to Default Configuration NodeInstalling Software Options Accessing Node Serial Number from Node Statistics Access SerialNumber Status/Statistics Select Node Stat25. Serial Number on Node Stat Screen Enabling a Software Access Key Configure Select Software Key TableFollow These StepsInstalling New Software Options in an Existing Network Install NewEnhanced LAN Option Appendix a CablesFunction/Signal Pin Function/SignalPin Name PositionPosition Signal Name 35/V.36 Modulus 9/21 EnclosuresFunction Pin FunctionSignals Modulus 9/21 Enclosures 35/V.36 Signals Standalone and Modulus 8/18 Enclosures Signals Standalone and Modulus 8/18 Enclosures Position NamePin Function Page Specifications Physical CharacteristicsUnit Dimensions Power Requirements EnvironmentalLimits Index DIMLL 2-69RS