2AO’lÍŸyÍŸ›Ïl›ÏÆ
›ÏßcØYÏ‹Ÿ› ³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³¦
Scope | 1 |
Model Designation | 1 |
System Overview | 2 |
Communication Capabilities | 2 |
Thermal Transfer Printer Internal Functions | 2 |
Print Mechanism Capabilities | 2 |
Media Transport Mechanism Capabilities | 3 |
Additional System Requirements | 3 |
Media and Ribbon Requirements | 4 |
Warnings and Precautions | 4 |
Installation | 4 |
230 VAC Operation | 4 |
Use of Shielded Cable | 5 |
Ribbons and Printhead Wear | 5 |
Repacking | 5 |
›ÆÏA’’AÏ‹Ÿ› ³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³³Ê
Unpacking | 7 |
Inspection | 7 |
Reporting Damage | 7 |
Storage and Reshipping | 8 |
Power Connection | 8 |
AC Voltage Selection Procedure | 8 |
AC Power Fuse Replacement | 9 |
115 VAC Operation | 10 |
230 VAC Operation | 10 |
Site Requirements | 10 |
Ribbon Loading (105Se) | 11 |
Ribbon Loading (160S) | 14 |
Zebra | iii |