Nortel Networks 703t manual Environmental specifications

Page 17

October 2006703t server description

Environmental specifications

Environmental condition

Specification

 

 

Operating temperature

10°C to 35°C (50°F to 95°F)

 

Maximum rate of change must not

 

exceed 10°C (50°F) per hour.

 

 

Non-operating (storage)

-40°C to 70°C (-40°F to 158°F)

temperature

 

 

 

Non-operating humidity

95%, non-condensing at 30°C (86°F)

 

 

Altitude

1829 m (6000 ft)

 

 

Electrostatic discharge

15 kV or more

 

 

Acoustic noise

50 dBA in a typical office ambient

 

temperature (18°C to 25°C

 

[64.4°F to 77°F])

 

 

Operating shock

No errors with a half sine wave shock

 

of 2G (with 1 millisecond duration)

 

 

Handling drop

Operational after a free fall from

 

450 mm to 600 mm (18 in. to 24 in.)

 

(depending on weight)

 

 

703t Server Hardware Installation

17

Image 17
Contents 703t Server Hardware Installation Copyright 2006 Nortel Networks October Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List Task List Contents Contents Getting Help from the Nortel Web site Getting Help over the phone from a Nortel Solutions CenterA p t e r Getting Help through a Nortel distributor or reseller This chapter 703t server descriptionServer dimensions Server featuresEnvironmental specifications CD-ROM Front panel featuresServer in the Installation and Configuration 703t server descriptionStandard Rear panel diagram Part Color Slot assignments BRD01 Slot definition and numberingNetwork connectivity Sample network setup Meridian Telephony LAN/Customer LAN 10/100/1000Base-T Sample network setup SuccessionLAN connectivity Switch connectivityNetwork requirements Remote access connectivitySupported peripheral devices CallPilot Customer Documentation Map Reference documents703t server description Preinstallation requirements Introduction Installation overviewInstallation checklist October 2006Preinstallation requirements Conventions for warnings To unpack the equipment Unpacking the 703t serverWhat’s next? To remove the side panel Removing the side coverG101761 October To inspect the server interior Inspecting the server interiorTo replace the side cover Replacing the side coverTop To install the chassis feet Installing the chassis feetWhat’s next? Installing the server and connecting the peripheral devices To install the server Installing the serverRequired equipment Modem DIP switchesPreparing the modem DIP OFF To set the modem DIP switchesNvram Rear panel Connecting peripherals to the serverInstalling the server and connecting the peripheral devices To connect the modem to the server To connect the mouse, keyboard, and monitor to the serverInstalling the server and connecting the peripheral devices Connect the server to the Elan and Clan hubs if applicable Your network, see the Planning and Engineering Guide Connecting the server to the ElanRisk of fire hazard To connect the server to the Clan Connecting the server to the Clan optionalInstalling the Nortel software feature dongle Requirements To install the software feature dongleBefore you begin Connecting the server to powerCallPilot Server To start the server To connect the server to powerInstalling the server and connecting the peripheral devices Numerics IndexDIP switches, setting October Index Standard Page 703t Server Hardware Installation