Nortel Networks 703t manual Task List

Page 9

To unpack the equipment

37

To remove the side panel

39

To inspect the server interior

42

To replace the side cover

43

To install the chassis feet

45

To install the server

48

To set the modem DIP switches

51

To connect the mouse, keyboard, and monitor to the server

55

To connect the modem to the server

55

To connect the server to the ELAN

 

(Meridian 1 or Succession 1000 only)

58

To connect the server to the CLAN

60

To install the software feature dongle

62

To connect the server to power

65

To start the server

65

703t Server Hardware Installation

9

Image 9
Contents 703t Server Hardware Installation Copyright 2006 Nortel Networks October Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List Task List Contents Contents Getting Help over the phone from a Nortel Solutions Center A p t e rGetting Help from the Nortel Web site Getting Help through a Nortel distributor or reseller This chapter 703t server descriptionServer dimensions Server featuresEnvironmental specifications CD-ROM Front panel featuresServer in the Installation and Configuration 703t server descriptionStandard Rear panel diagram Part Color Slot assignments BRD01 Slot definition and numberingNetwork connectivity Sample network setup Meridian Telephony LAN/Customer LAN 10/100/1000Base-T Sample network setup SuccessionLAN connectivity Switch connectivityNetwork requirements Remote access connectivitySupported peripheral devices CallPilot Customer Documentation Map Reference documents703t server description Preinstallation requirements Installation overview Installation checklistIntroduction October 2006Preinstallation requirements Conventions for warnings To unpack the equipment Unpacking the 703t serverWhat’s next? To remove the side panel Removing the side coverG101761 October To inspect the server interior Inspecting the server interiorTo replace the side cover Replacing the side coverTop To install the chassis feet Installing the chassis feetWhat’s next? Installing the server and connecting the peripheral devices To install the server Installing the serverModem DIP switches Preparing the modemRequired equipment DIP OFF To set the modem DIP switchesNvram Rear panel Connecting peripherals to the serverInstalling the server and connecting the peripheral devices To connect the modem to the server To connect the mouse, keyboard, and monitor to the serverInstalling the server and connecting the peripheral devices Connect the server to the Elan and Clan hubs if applicable Your network, see the Planning and Engineering Guide Connecting the server to the ElanRisk of fire hazard To connect the server to the Clan Connecting the server to the Clan optionalInstalling the Nortel software feature dongle Requirements To install the software feature dongleBefore you begin Connecting the server to powerCallPilot Server To start the server To connect the server to powerInstalling the server and connecting the peripheral devices Numerics IndexDIP switches, setting October Index Standard Page 703t Server Hardware Installation