Preinstallation requirements | Standard 1.04 |
Installation overview
Introduction
This section provides an overview of the steps required to install the 703t server and peripheral devices. For detailed instructions, see Chapter 4, “Installing the server and connecting the peripheral devices.”
When you are finished, continue with the switch and server setup as described in the document for your switch:
Succession 1000 System and CallPilot Server Configuration
Meridian 1 and CallPilot Server Configuration
Installation checklist
Step | Description | Check |
|
|
|
1 | Review the “Installing the CallPilot server” section in the | ❒ |
| Installation and Configuration Task List |
|
| complete stage 1 of the “Installation checklist.” |
|
|
|
|
2 | Unpack the server, and ensure you have all the items you need | ❒ |
| (see page 37). |
|
| Complete the following checklists that are provided in the |
|
| Installation and Configuration Task List |
|
| “CallPilot software media and documentation checklist” |
|
| “CallPilot server hardware checklist” |
|
|
|
|
3 | Remove the server side cover, and inspect the interior (see | ❒ |
| pages 39 and 42). |
|
|
|
|
4 | Replace the server side cover. | ❒ |
34 | CallPilot |