Preinstallation requirements

Standard 1.04

1Ensure that the server is laying on its side, supported to give the server bottom four to five inches clearance above the work surface.

2Attach the feet as shown in the preceding diagram.

Use four screws to attach each foot to the chassis. The holes in the feet line up with only one set of holes in the chassis, as follows:

„front foot: The middle hole is towards the front of the chassis.

„back foot: The middle hole is towards the back of the chassis.

3Place the server on its feet.

What’s next?

Continue with the hardware installation. For more information, see “Installation checklist” on page 34.

46

CallPilot

Image 46
Contents 703t Server Hardware Installation Copyright 2006 Nortel Networks October Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List Task List Contents Contents A p t e r Getting Help over the phone from a Nortel Solutions CenterGetting Help from the Nortel Web site Getting Help through a Nortel distributor or reseller 703t server description This chapterServer features Server dimensionsEnvironmental specifications Front panel features CD-ROMServer in the Installation and Configuration 703t server descriptionStandard Rear panel diagram Part Color Slot assignments Slot definition and numbering BRD01Network connectivity Sample network setup Meridian Sample network setup Succession Telephony LAN/Customer LAN 10/100/1000Base-TSwitch connectivity LAN connectivityRemote access connectivity Network requirementsSupported peripheral devices Reference documents CallPilot Customer Documentation Map703t server description Preinstallation requirements Installation checklist Installation overviewIntroduction October 2006Preinstallation requirements Conventions for warnings Unpacking the 703t server To unpack the equipmentWhat’s next? Removing the side cover To remove the side panelG101761 October Inspecting the server interior To inspect the server interiorReplacing the side cover To replace the side coverTop Installing the chassis feet To install the chassis feetWhat’s next? Installing the server and connecting the peripheral devices Installing the server To install the serverPreparing the modem Modem DIP switchesRequired equipment DIP To set the modem DIP switches OFFNvram Connecting peripherals to the server Rear panelInstalling the server and connecting the peripheral devices To connect the mouse, keyboard, and monitor to the server To connect the modem to the serverInstalling the server and connecting the peripheral devices Connect the server to the Elan and Clan hubs if applicable Connecting the server to the Elan Your network, see the Planning and Engineering GuideRisk of fire hazard Connecting the server to the Clan optional To connect the server to the ClanInstalling the Nortel software feature dongle To install the software feature dongle RequirementsConnecting the server to power Before you beginCallPilot Server To connect the server to power To start the serverInstalling the server and connecting the peripheral devices Index NumericsDIP switches, setting October Index Standard Page 703t Server Hardware Installation