Nortel Networks 703t manual Installing the server, To install the server

Page 48

Installing the server and connecting the peripheral devices

Standard 1.04

Installing the server

Before you install the 703t server, ensure that the chosen location meets the requirements identified in the “Site inspection checklist” provided in the Installation and Configuration Task List (555-7101-210).

To install the server

1Place the 703t server in its chosen location.

Note: The server must be placed within 20 m (60 feet) of the Meridian 1 switch or Succession 1000 system.

Note: The DS30X cable that connects the MPB96 boards to the MGate cards is 20 m (60 feet) long. This allows the server to be placed in a different room from the Meridian 1 switch or Succession 1000 system.

2Connect peripheral devices as described in the remainder of this chapter.

48

CallPilot

Image 48
Contents 703t Server Hardware Installation Copyright 2006 Nortel Networks October Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List Task List Contents Contents Getting Help over the phone from a Nortel Solutions Center A p t e rGetting Help from the Nortel Web site Getting Help through a Nortel distributor or reseller 703t server description This chapterServer features Server dimensionsEnvironmental specifications Front panel features CD-ROMServer in the Installation and Configuration 703t server descriptionStandard Rear panel diagram Part Color Slot assignments Slot definition and numbering BRD01Network connectivity Sample network setup Meridian Sample network setup Succession Telephony LAN/Customer LAN 10/100/1000Base-TSwitch connectivity LAN connectivityRemote access connectivity Network requirementsSupported peripheral devices Reference documents CallPilot Customer Documentation Map703t server description Preinstallation requirements Installation overview Installation checklistIntroduction October 2006Preinstallation requirements Conventions for warnings Unpacking the 703t server To unpack the equipmentWhat’s next? Removing the side cover To remove the side panelG101761 October Inspecting the server interior To inspect the server interiorReplacing the side cover To replace the side coverTop Installing the chassis feet To install the chassis feetWhat’s next? Installing the server and connecting the peripheral devices Installing the server To install the serverModem DIP switches Preparing the modemRequired equipment DIP To set the modem DIP switches OFFNvram Connecting peripherals to the server Rear panelInstalling the server and connecting the peripheral devices To connect the mouse, keyboard, and monitor to the server To connect the modem to the serverInstalling the server and connecting the peripheral devices Connect the server to the Elan and Clan hubs if applicable Connecting the server to the Elan Your network, see the Planning and Engineering GuideRisk of fire hazard Connecting the server to the Clan optional To connect the server to the ClanInstalling the Nortel software feature dongle To install the software feature dongle RequirementsConnecting the server to power Before you beginCallPilot Server To connect the server to power To start the serverInstalling the server and connecting the peripheral devices Index NumericsDIP switches, setting October Index Standard Page 703t Server Hardware Installation