Nortel Networks manual Unpacking the 703t server, To unpack the equipment

Page 37

October 2006

Preinstallation requirements

Unpacking the 703t server

Introduction

Follow this procedure to unpack the server and peripherals.

WARNING

Risk of personal injury

The 703t CallPilot server weighs approximately 22 kg (46 lb) as shipped from manufacturing. If necessary, and to prevent personal injury, ask someone to help you unpack and position the server.

To unpack the equipment

ATTENTION

As you unpack each item, check it off against the

 

 

packing list, as well as against the following checklists

 

provided in the Installation and Configuration Task List

 

(555-7101-210):

 

„

“CallPilot software media and documentation

 

 

checklist”

 

„

“CallPilot server hardware checklist”

1Carefully open the cardboard carton containing the server.

2Remove the server from the carton and set it on the floor.

3Carefully open the cartons containing the monitor, keyboard, mouse, modem, and ELAN hub (if supplied), and set the peripherals aside.

4Put all manuals, CD-ROMs, operating system disks, and any disks for peripherals in a safe place.

703t Server Hardware Installation

37

Image 37
Contents 703t Server Hardware Installation Copyright 2006 Nortel Networks October Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List Task List Contents Contents A p t e r Getting Help over the phone from a Nortel Solutions CenterGetting Help from the Nortel Web site Getting Help through a Nortel distributor or reseller This chapter 703t server descriptionServer dimensions Server featuresEnvironmental specifications CD-ROM Front panel featuresServer in the Installation and Configuration 703t server descriptionStandard Rear panel diagram Part Color Slot assignments BRD01 Slot definition and numberingNetwork connectivity Sample network setup Meridian Telephony LAN/Customer LAN 10/100/1000Base-T Sample network setup SuccessionLAN connectivity Switch connectivityNetwork requirements Remote access connectivitySupported peripheral devices CallPilot Customer Documentation Map Reference documents703t server description Preinstallation requirements Installation checklist Installation overviewIntroduction October 2006Preinstallation requirements Conventions for warnings To unpack the equipment Unpacking the 703t serverWhat’s next? To remove the side panel Removing the side coverG101761 October To inspect the server interior Inspecting the server interiorTo replace the side cover Replacing the side coverTop To install the chassis feet Installing the chassis feetWhat’s next? Installing the server and connecting the peripheral devices To install the server Installing the serverPreparing the modem Modem DIP switchesRequired equipment DIP OFF To set the modem DIP switchesNvram Rear panel Connecting peripherals to the serverInstalling the server and connecting the peripheral devices To connect the modem to the server To connect the mouse, keyboard, and monitor to the serverInstalling the server and connecting the peripheral devices Connect the server to the Elan and Clan hubs if applicable Your network, see the Planning and Engineering Guide Connecting the server to the ElanRisk of fire hazard To connect the server to the Clan Connecting the server to the Clan optionalInstalling the Nortel software feature dongle Requirements To install the software feature dongleBefore you begin Connecting the server to powerCallPilot Server To start the server To connect the server to powerInstalling the server and connecting the peripheral devices Numerics IndexDIP switches, setting October Index Standard Page 703t Server Hardware Installation