Nortel Networks 703t manual Top

Page 44

Preinstallation requirements

Standard 1.04

The following diagram shows how to: 1) align the tabs, 2) engage the cover, and 3) tighten the thumbscrews.

Top and

bottom tabs

on cover

Top and

bottom slots

in chassis

1

2

3

G101762

What’s next?

If you want to install the chassis feet on the bottom of the server, continue with “Installing the chassis feet” on page 45. Otherwise, continue with the hardware installation. For more information, see “Installation checklist” on page 34.

44

CallPilot

Image 44
Contents 703t Server Hardware Installation Copyright 2006 Nortel Networks October Information for Japan があります。この場合には使用者が適切な対策を取るように要求されることがあ ります。 Standard Publication history Publication history Task List Task List Contents Contents Getting Help from the Nortel Web site Getting Help over the phone from a Nortel Solutions CenterA p t e r Getting Help through a Nortel distributor or reseller 703t server description This chapterServer features Server dimensionsEnvironmental specifications Front panel features CD-ROMServer in the Installation and Configuration 703t server descriptionStandard Rear panel diagram Part Color Slot assignments Slot definition and numbering BRD01Network connectivity Sample network setup Meridian Sample network setup Succession Telephony LAN/Customer LAN 10/100/1000Base-TSwitch connectivity LAN connectivityRemote access connectivity Network requirementsSupported peripheral devices Reference documents CallPilot Customer Documentation Map703t server description Preinstallation requirements Introduction Installation overviewInstallation checklist October 2006Preinstallation requirements Conventions for warnings Unpacking the 703t server To unpack the equipmentWhat’s next? Removing the side cover To remove the side panelG101761 October Inspecting the server interior To inspect the server interiorReplacing the side cover To replace the side coverTop Installing the chassis feet To install the chassis feetWhat’s next? Installing the server and connecting the peripheral devices Installing the server To install the serverRequired equipment Modem DIP switchesPreparing the modem DIP To set the modem DIP switches OFFNvram Connecting peripherals to the server Rear panelInstalling the server and connecting the peripheral devices To connect the mouse, keyboard, and monitor to the server To connect the modem to the serverInstalling the server and connecting the peripheral devices Connect the server to the Elan and Clan hubs if applicable Connecting the server to the Elan Your network, see the Planning and Engineering GuideRisk of fire hazard Connecting the server to the Clan optional To connect the server to the ClanInstalling the Nortel software feature dongle To install the software feature dongle RequirementsConnecting the server to power Before you beginCallPilot Server To connect the server to power To start the serverInstalling the server and connecting the peripheral devices Index NumericsDIP switches, setting October Index Standard Page 703t Server Hardware Installation