Nortel Networks NN44200-300 manual To replace the front bezel after installation is complete

Page 30

30 Chapter 3 Preparing for installation

 

 

IF

THEN

 

 

 

 

components have become loose

secure them.

 

 

Refer to the procedures in the

 

 

Installation and Configuration

 

 

Task List (NN44200-306).

you are satisfied that the 1002rp server has arrived at your site undamaged

replace the server cover and proceed with the hardware installation.

See "Installation checklist" (page 23).

Note: Do not reinstall the front bezel until the server is in its final location and the CallPilot installation is complete.

—End—

To replace the front bezel after installation is complete

Step Action

When the CallPilot server installation is complete and the server is in its final location, replace the front bezel.

1Align the front bezel with the ball studs located at each faceplate corner.

See the diagram below:

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300 01.01 Standard

5.0 23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

Image 30
Contents 1002rp Server Hardware Installation Trademarks Information for Japan Japan Denan statementJapan Vcci statement Page Publication History FebruaryPublication History Contents Contents Getting help over the phone from a Nortel Solutions Center Getting help from the Nortel Web siteGetting help through a Nortel distributor or reseller This chapter Server featuresServer dimensions and weight IntroductionFront panel features front view without the front bezel Environmental specificationsAlarm board Rear panel diagramOverhead view of empty server showing PCI and ISA connectors Slot assignments Reference Documents1002rp server description Slot definition and slot numbering T1/SMDINetwork connectivity BRD20Sample network setup Meridian Sample network setup Communication ServerMeridian 1 or Communication Server 1000 systems Switch connectivityCallPilot Elan subnet and Nortel server subnet setup Network requirementsRemote access connectivity Supported peripheral devicesDeviceDescription Installation overview Installation checklistPreparing for installation Conventions for warnings Unpacking the 1002rp server To unpack the equipmentWhat is next? Removing the front bezel and server coverTo remove the front bezel To remove the server cover Remove the front bezel see To remove the front bezelInspecting the server interior To inspect the server interiorTo replace the front bezel after installation is complete Installation and ConfigurationEnd Preparing for installation Safety precautions Safety informationEquipment handling guidelines Installing the second power supply module AC or DC About the power supply moduleAC versus DC systems To install the power supply module DC wire gauge tables AWGMetric wire conversion DC rack cablingPower supply installation Rack power and grounding PDU power and grounding About the power distribution unitDC power distribution rationale Multiple PDUsPDU terminal blocks and wiring diagram DC power inputBringing power and ground into the PDU To bring DC power and ground into the PDUInstalling the server To install the serverModem DIP switches Preparing the modemRequired equipment To set the modem DIP switches DIPContinue with Connecting peripherals to the server Connecting peripherals to the server To connect the modem to the server Connecting the server to the Elan subnet Media Access Control addressTo connect the server to the Elan subnet Server will Connecting the server to the Nortel server subnet optional To connect the server to the Nortel server subnetInstalling the Nortel software feature dongle To install the software feature dongleRequirements Connecting the server to power Before you beginTo connect the 1002rp AC server to power Plug the server AC power cord into the server rear panelTo connect the 1002rp DC server to power To start the server Copyright 2007, Nortel Networks Ferrites secured to an external cable Index Index Tlan Index Page 1002rp Server Hardware Installation