Installation overview
Introduction
This section provides an overview of the steps required to install the 1002rp server and peripheral devices.
Installation checklist
The following checklist identifies the tasks that must be performed when installing the CallPilot server. For detailed instructions, see "Installing the server" (page 43) When you are finished with the installation, continue with the Installation and Configuration Task List
Step | Description | Check |
1Ensure that you have reviewed the "Installing the CallPilot server" section in the Installation and Configuration Task List