Nortel Networks NN44200-300 manual To install the power supply module

Page 35

Installing the second power supply module (AC or DC) 35

To install the power supply module

DANGER

High current inside the chassis can cause severe injury.

The server is shipped with one power supply module installed in the bottom power supply bay. You must install the second power supply module, as described here:

Step Action

1Align the power supply module with the top power supply bay.

2Slide the power supply module into the bay until the module is secured by its connector.

Use some force, if necessary.

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300 01.01 Standard

5.0 23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

Image 35
Contents 1002rp Server Hardware Installation Trademarks Japan Vcci statement Information for JapanJapan Denan statement Page February Publication HistoryPublication History Contents Contents Getting help from the Nortel Web site Getting help over the phone from a Nortel Solutions CenterGetting help through a Nortel distributor or reseller Introduction Server featuresServer dimensions and weight This chapterEnvironmental specifications Front panel features front view without the front bezelRear panel diagram Alarm boardOverhead view of empty server showing PCI and ISA connectors Reference Documents Slot assignments1002rp server description T1/SMDI Slot definition and slot numberingBRD20 Network connectivitySample network setup Communication Server Sample network setup MeridianNetwork requirements Switch connectivityCallPilot Elan subnet and Nortel server subnet setup Meridian 1 or Communication Server 1000 systemsSupported peripheral devices Remote access connectivityDeviceDescription Installation checklist Installation overviewPreparing for installation Conventions for warnings To unpack the equipment Unpacking the 1002rp serverTo remove the front bezel What is next?Removing the front bezel and server cover Remove the front bezel see To remove the front bezel To remove the server coverTo inspect the server interior Inspecting the server interiorInstallation and Configuration To replace the front bezel after installation is completeEnd Preparing for installation Equipment handling guidelines Safety precautionsSafety information AC versus DC systems Installing the second power supply module AC or DCAbout the power supply module To install the power supply module AWG DC wire gauge tablesDC rack cabling Metric wire conversionPower supply installation Rack power and grounding Multiple PDUs About the power distribution unitDC power distribution rationale PDU power and groundingDC power input PDU terminal blocks and wiring diagramTo bring DC power and ground into the PDU Bringing power and ground into the PDUTo install the server Installing the serverRequired equipment Modem DIP switchesPreparing the modem DIP To set the modem DIP switchesContinue with Connecting peripherals to the server Connecting peripherals to the server To connect the modem to the server To connect the server to the Elan subnet Connecting the server to the Elan subnetMedia Access Control address Server will To connect the server to the Nortel server subnet Connecting the server to the Nortel server subnet optionalRequirements Installing the Nortel software feature dongleTo install the software feature dongle Before you begin Connecting the server to powerPlug the server AC power cord into the server rear panel To connect the 1002rp AC server to powerTo connect the 1002rp DC server to power To start the server Copyright 2007, Nortel Networks Ferrites secured to an external cable Index Index Tlan Index Page 1002rp Server Hardware Installation