Nortel Networks NN44200-300 manual Alarm board, Rear panel diagram

Page 13

Server features 13

Alarm board

The alarm board is located under the baseboard. It connects to the status display panel on the front.

Rear panel diagram

The following diagram shows the slot locations in the rear panel, and the power switch and power input for an AC server. The rest of the diagram is the same for AC or DC servers.

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300 01.01 Standard

5.0 23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

Image 13
Contents 1002rp Server Hardware Installation Trademarks Japan Denan statement Information for JapanJapan Vcci statement Page February Publication HistoryPublication History Contents Contents Getting help from the Nortel Web site Getting help over the phone from a Nortel Solutions CenterGetting help through a Nortel distributor or reseller Server dimensions and weight Server featuresThis chapter IntroductionEnvironmental specifications Front panel features front view without the front bezelRear panel diagram Alarm boardOverhead view of empty server showing PCI and ISA connectors Reference Documents Slot assignments1002rp server description T1/SMDI Slot definition and slot numberingBRD20 Network connectivitySample network setup Communication Server Sample network setup MeridianCallPilot Elan subnet and Nortel server subnet setup Switch connectivityMeridian 1 or Communication Server 1000 systems Network requirementsSupported peripheral devices Remote access connectivityDeviceDescription Installation checklist Installation overviewPreparing for installation Conventions for warnings To unpack the equipment Unpacking the 1002rp serverRemoving the front bezel and server cover What is next?To remove the front bezel Remove the front bezel see To remove the front bezel To remove the server coverTo inspect the server interior Inspecting the server interiorInstallation and Configuration To replace the front bezel after installation is completeEnd Preparing for installation Safety information Safety precautionsEquipment handling guidelines About the power supply module Installing the second power supply module AC or DCAC versus DC systems To install the power supply module AWG DC wire gauge tablesDC rack cabling Metric wire conversionPower supply installation Rack power and grounding DC power distribution rationale About the power distribution unitPDU power and grounding Multiple PDUsDC power input PDU terminal blocks and wiring diagramTo bring DC power and ground into the PDU Bringing power and ground into the PDUTo install the server Installing the serverPreparing the modem Modem DIP switchesRequired equipment DIP To set the modem DIP switchesContinue with Connecting peripherals to the server Connecting peripherals to the server To connect the modem to the server Media Access Control address Connecting the server to the Elan subnetTo connect the server to the Elan subnet Server will To connect the server to the Nortel server subnet Connecting the server to the Nortel server subnet optionalTo install the software feature dongle Installing the Nortel software feature dongleRequirements Before you begin Connecting the server to powerPlug the server AC power cord into the server rear panel To connect the 1002rp AC server to powerTo connect the 1002rp DC server to power To start the server Copyright 2007, Nortel Networks Ferrites secured to an external cable Index Index Tlan Index Page 1002rp Server Hardware Installation