Nortel Networks
NN44200-300
manual
Install
Rear panel diagram
DC wire gauge tables
Dimension
Remote access connectivity
Sample network setup Meridian
What is
Safety precautions
About the power supply module
Switch connectivity
Page 63
Page 62
Page 64
Image 63
Page 62
Page 64
Contents
1002rp Server Hardware Installation
Trademarks
Information for Japan
Japan Denan statement
Japan Vcci statement
Page
February
Publication History
Publication History
Contents
Contents
Getting help from the Nortel Web site
Getting help over the phone from a Nortel Solutions Center
Getting help through a Nortel distributor or reseller
Introduction
Server features
Server dimensions and weight
This chapter
Environmental specifications
Front panel features front view without the front bezel
Rear panel diagram
Alarm board
Overhead view of empty server showing PCI and ISA connectors
Reference Documents
Slot assignments
1002rp server description
T1/SMDI
Slot definition and slot numbering
BRD20
Network connectivity
Sample network setup Communication Server
Sample network setup Meridian
Network requirements
Switch connectivity
CallPilot Elan subnet and Nortel server subnet setup
Meridian 1 or Communication Server 1000 systems
Supported peripheral devices
Remote access connectivity
DeviceDescription
Installation checklist
Installation overview
Preparing for installation
Conventions for warnings
To unpack the equipment
Unpacking the 1002rp server
What is next?
Removing the front bezel and server cover
To remove the front bezel
Remove the front bezel see To remove the front bezel
To remove the server cover
To inspect the server interior
Inspecting the server interior
Installation and Configuration
To replace the front bezel after installation is complete
End
Preparing for installation
Safety precautions
Safety information
Equipment handling guidelines
Installing the second power supply module AC or DC
About the power supply module
AC versus DC systems
To install the power supply module
AWG
DC wire gauge tables
DC rack cabling
Metric wire conversion
Power supply installation
Rack power and grounding
Multiple PDUs
About the power distribution unit
DC power distribution rationale
PDU power and grounding
DC power input
PDU terminal blocks and wiring diagram
To bring DC power and ground into the PDU
Bringing power and ground into the PDU
To install the server
Installing the server
Modem DIP switches
Preparing the modem
Required equipment
DIP
To set the modem DIP switches
Continue with Connecting peripherals to the server
Connecting peripherals to the server
To connect the modem to the server
Connecting the server to the Elan subnet
Media Access Control address
To connect the server to the Elan subnet
Server will
To connect the server to the Nortel server subnet
Connecting the server to the Nortel server subnet optional
Installing the Nortel software feature dongle
To install the software feature dongle
Requirements
Before you begin
Connecting the server to power
Plug the server AC power cord into the server rear panel
To connect the 1002rp AC server to power
To connect the 1002rp DC server to power
To start the server
Copyright 2007, Nortel Networks
Ferrites secured to an external cable
Index
Index
Tlan
Index
Page
1002rp Server Hardware Installation
Related pages
Tips and Troubleshooting for HP from MP7001 30GB Color
60 Specifications for BenQ MX701
Error Codes for Pride Mobility 1103 ULTRA
Appendix 1. Block Diagram for Citizen Systems 291
Erase Group appears when you select Personal Grps for Sanyo SCP-7050
M1 Stapler Replacement Parts List for Senco M1
Language code list for Panasonic DVD-K33
Disc types and contents your product can play for Samsung HT-E8200/XE
Display Issues for POSIFLEX Business Machines XP3000
Why does my camcorder display PAUSED PLEASE WAIT due to condensation?
Condensation Issues
Top
Page
Image
Contents