Nortel Networks NN44200-300 manual Contents

Page 7

 

 

 

 

7

Contents

 

 

 

 

Chapter 1

How to get help

9

 

 

 

 

 

Chapter 2

1002rp server description

11

 

Server features

11

 

 

Slot assignments

15

 

Reference Documents 15

Network connectivity 18

Supported peripheral devices 21

Chapter 3 Preparing for installation

23

Installation overview 23

 

 

Unpacking the 1002rp server

26

 

Removing the front bezel and server cover 27

 

Inspecting the server interior

29

 

 

 

 

Chapter 4 Power supply installation

33

Safety precautions 33

 

Installing the second power supply module (AC or DC)

34

DC wire gauge tables 36

DC rack cabling 37

About the power distribution unit 40

Bringing power and ground into the PDU 42

Chapter 5 Installing the server and connecting the peripheral

devices

 

43

Installing the server

43

 

Preparing the modem

44

 

Connecting peripherals to the server 47

 

Connecting the server to the ELAN subnet

49

Connecting the server to the Nortel server subnet (optional) 51

Installing the Nortel software feature dongle

52

Connecting the server to power 53

 

 

Appendix A EMC emission level protection for the 1002rp

Server

 

57

Index

 

59

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300 01.01 Standard

5.0 23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

Image 7
Contents 1002rp Server Hardware Installation Trademarks Japan Denan statement Information for JapanJapan Vcci statement Page February Publication HistoryPublication History Contents Contents Getting help from the Nortel Web site Getting help over the phone from a Nortel Solutions CenterGetting help through a Nortel distributor or reseller Introduction Server featuresServer dimensions and weight This chapterEnvironmental specifications Front panel features front view without the front bezelRear panel diagram Alarm boardOverhead view of empty server showing PCI and ISA connectors Reference Documents Slot assignments1002rp server description T1/SMDI Slot definition and slot numberingBRD20 Network connectivitySample network setup Communication Server Sample network setup MeridianNetwork requirements Switch connectivityCallPilot Elan subnet and Nortel server subnet setup Meridian 1 or Communication Server 1000 systemsSupported peripheral devices Remote access connectivityDeviceDescription Installation checklist Installation overviewPreparing for installation Conventions for warnings To unpack the equipment Unpacking the 1002rp serverRemoving the front bezel and server cover What is next?To remove the front bezel Remove the front bezel see To remove the front bezel To remove the server coverTo inspect the server interior Inspecting the server interiorInstallation and Configuration To replace the front bezel after installation is completeEnd Preparing for installation Safety information Safety precautionsEquipment handling guidelines About the power supply module Installing the second power supply module AC or DCAC versus DC systems To install the power supply module AWG DC wire gauge tablesDC rack cabling Metric wire conversionPower supply installation Rack power and grounding Multiple PDUs About the power distribution unitDC power distribution rationale PDU power and groundingDC power input PDU terminal blocks and wiring diagramTo bring DC power and ground into the PDU Bringing power and ground into the PDUTo install the server Installing the serverPreparing the modem Modem DIP switchesRequired equipment DIP To set the modem DIP switchesContinue with Connecting peripherals to the server Connecting peripherals to the server To connect the modem to the server Media Access Control address Connecting the server to the Elan subnetTo connect the server to the Elan subnet Server will To connect the server to the Nortel server subnet Connecting the server to the Nortel server subnet optionalTo install the software feature dongle Installing the Nortel software feature dongleRequirements Before you begin Connecting the server to powerPlug the server AC power cord into the server rear panel To connect the 1002rp AC server to powerTo connect the 1002rp DC server to power To start the server Copyright 2007, Nortel Networks Ferrites secured to an external cable Index Index Tlan Index Page 1002rp Server Hardware Installation