Nortel Networks
NN44200-300
manual
Install
Rear panel diagram
DC wire gauge tables
Dimension
Remote access connectivity
Sample network setup Meridian
What is
Safety precautions
About the power supply module
Switch connectivity
Page 4
Page 3
Page 5
Image 4
Page 3
Page 5
Contents
1002rp Server Hardware Installation
Trademarks
Japan Denan statement
Information for Japan
Japan Vcci statement
Page
Publication History
February
Publication History
Contents
Contents
Getting help over the phone from a Nortel Solutions Center
Getting help from the Nortel Web site
Getting help through a Nortel distributor or reseller
Server features
Server dimensions and weight
This chapter
Introduction
Front panel features front view without the front bezel
Environmental specifications
Alarm board
Rear panel diagram
Overhead view of empty server showing PCI and ISA connectors
Slot assignments
Reference Documents
1002rp server description
Slot definition and slot numbering
T1/SMDI
Network connectivity
BRD20
Sample network setup Meridian
Sample network setup Communication Server
Switch connectivity
CallPilot Elan subnet and Nortel server subnet setup
Meridian 1 or Communication Server 1000 systems
Network requirements
Remote access connectivity
Supported peripheral devices
DeviceDescription
Installation overview
Installation checklist
Preparing for installation
Conventions for warnings
Unpacking the 1002rp server
To unpack the equipment
Removing the front bezel and server cover
What is next?
To remove the front bezel
To remove the server cover
Remove the front bezel see To remove the front bezel
Inspecting the server interior
To inspect the server interior
To replace the front bezel after installation is complete
Installation and Configuration
End
Preparing for installation
Safety information
Safety precautions
Equipment handling guidelines
About the power supply module
Installing the second power supply module AC or DC
AC versus DC systems
To install the power supply module
DC wire gauge tables
AWG
Metric wire conversion
DC rack cabling
Power supply installation
Rack power and grounding
About the power distribution unit
DC power distribution rationale
PDU power and grounding
Multiple PDUs
PDU terminal blocks and wiring diagram
DC power input
Bringing power and ground into the PDU
To bring DC power and ground into the PDU
Installing the server
To install the server
Preparing the modem
Modem DIP switches
Required equipment
To set the modem DIP switches
DIP
Continue with Connecting peripherals to the server
Connecting peripherals to the server
To connect the modem to the server
Media Access Control address
Connecting the server to the Elan subnet
To connect the server to the Elan subnet
Server will
Connecting the server to the Nortel server subnet optional
To connect the server to the Nortel server subnet
To install the software feature dongle
Installing the Nortel software feature dongle
Requirements
Connecting the server to power
Before you begin
To connect the 1002rp AC server to power
Plug the server AC power cord into the server rear panel
To connect the 1002rp DC server to power
To start the server
Copyright 2007, Nortel Networks
Ferrites secured to an external cable
Index
Index
Tlan
Index
Page
1002rp Server Hardware Installation
Related pages
Troubleshooting Guide for BRK electronic GCO1B
Specifications for Lumex Syatems RJ4300G
Error Code and Error Status Names for Toshiba A10
Connection Diagram for VocoPro CDG X-3 Mark II
HOW to USE Programs Directly from OUR WEB Site for NordicTrack NTTL15510
Reinstalling Windows for Dell 2200
Parts List for Desa SVYD18N
Language Code List for Onkyo HTP-V10X
What is it? for Philips 190S1
safety Information for Samsung RS261MDPN
How do I set up the
Cateye CC-HB100
for optimal use?
Top
Page
Image
Contents