Hardware Installation
Installation Steps
1.Unpack the Industrial switch.
2.Ensure the
3.Apply power to the switch (refer to the Wiring the Power Inputs section). The power LED will light.
4.Connect CAT 5 cables to the Industrial switch’s
[NOTE] If the network devices do not support MID/MDIX, a crossover cable may be required.
Manual Documentation Number: | 15 |
B&B Electronics Mfg Co Inc – 707 Dayton Rd - PO Box 1040 - Ottawa IL 61350 - Ph
B&B Electronics – Westlink Commercial Park – Oranmore, Galway, Ireland – Ph +353