Electrical Installation

Typical UPS Wiring Principle

Power wiring overview

See separate guide on parallel operation for wiring overview in parallel systems.

See also

AC Mains

Input Lugs

480 V, 3PH, 3W & GND

Q1Q5

22

Battery 1

Battery

Battery 2

UPS

7

Breakers

 

5

 

 

 

 

Q7

Q8

 

 

External

2

2

 

Battery

 

 

 

 

 

2

Q2

SSW

7

2

 

 

2

 

Q6

KK

4

Q3

4

 

 

 

Q4

 

 

KK

 

 

 

 

 

480 V, 3PH, 3W & GND

4 LBB

 

KK 4

Output Load Lugs

1. SOURCE AND AC CABLING MUST BE 480 VOLT, WYE CONNECTED, 3 PHASE, 3 WIRE + GROUND (CONTACT APC IF OTHER).

2. DASHED LINES BETWEEN UNITS ( — — — ) REPRESENT AC/DC CABLING PROVIDED BY OTHERS.

3. ALL AC CIRCUIT BREAKERS ARE 100% CONTINUOUS DUTY RATED WITH 24 VOLT DC SHUNT TRIPS AND 2A/2B AUXILIARY CONTACTS.

4. OPTIONAL COMPONENTS

5. SEPARATE CONDUITS. TWO WIRE + GROUND

6. UPS INPUT AND OUTPUT CONDUCTORS MUST BE IN SEPARATE AMPERE RATINGS.

7. UPS AND STATIC BYPASS WITHSTAND 200,000 SYMMETRICAL AMPERES.

8. INSTALLATION MUST COMPLY WITH ALL APPLICABLE NATIONAL AND LOCAL CODES.

Symmetra MW 1000 kW 480 V Installation - 990-4112E

7

Image 11
Contents Installation Page Contents Specifications Symbols used in this guide SafetyEPO Installation safetyControl Section UPS SectionsSerial number Inverter SectionConfiguration 1 Inverter Section placed to the left ConfigurationsTotal width of UPS sections 4138 mm/163 Weight Configuration 2 Inverter Section placed to the rightExternal Bypass Static Switch Power wiring overview Typical UPS Wiring PrincipleInput/Output wiring precautions External disconnection switchesTop Cable Entry Preparing for top cable entry defaultBattery cable connections top cable entry Front view of Input/Output Section Ground and AC cable connections top cable entry Preparing for bottom cable entry Bottom Cable EntryElectrical Installation Bottom Cable Entry Battery cable connections bottom cable entry Battery BAT 1 + BAT 2 + IN/OUT power cable bottom entry Ground and AC cable connections bottom cable entry Bypass Static Switch Wiring Top cable entry Bottom cable entry Connectionplane 0P0957 Communication cable overviewLocation of optional Relay Board Relay Board OptionalCommunication cables with optional Relay Board Relay Board functions Relay Name Events that will trigger the alarm Mode CommentIN1 Page High-impedance grounding Low-Impedance/High-Impedance GroundingLow-impedance grounding Specifications Low-Impedance/High-Impedance Grounding Installation Planning Data Electrical SpecificationDC Input AC InputHeat Dissipation AC OutputAC Input External Bypass SSW 16 National Electrical Code Size Temperature Rating of Cables See Table Recommended cable, bolt, and lug sizes Torque specificationsOutput and downstream breakers minimum settings Required Breaker SettingsInput and upstream breakers minimum settings Dual Utility Installation Nema General Specifications 480990-4112E