
Top Cable Entry
Preparing for top cable entry (default)
Cable entry in top cover of Input/Output Section.
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | Top view  | 
  | M6 Bolt  | ||||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | ||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | Battery  | 
  | Battery  | 
  | 
  | 
  | 
  | 
  | ||
  | 
  | cable  | 
  | cable  | 
  | 
  | 
  | 
  | 
  | ||
  | 
  | entry  | 
  | entry  | 
  | 
  | 
  | 
  | 
  | ||
  | AC IN cable  | 
  | AC OUT | 
  | 
  | 
  | 
  | ||||
  | entry  | 
  | cable entry  | 
  | 
  | 
  | |||||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
 ![]()
BAT 1 BAT 2
Top view
AC IN  | AC OUT  | ||
90  | L3 IN  | 95  | L3 OUT  | 
91  | L2 IN  | 94  | L2 OUT  | 
92  | L1 IN  | 93  | L1 OUT  | 
1.75 in /  | 1.75 in /  | |
44.45 mm  | ||
44.45 mm  | ||
  | ||
  | 2.3 in / 58 mm  | 
IN/OUT power cable (top entry)
L1 IN  | L1 OUT  | 
92  | 93  | 
L2 IN  | L2 OUT  | 
91  | 94  | 
L3 IN  | L3 OUT  | 
90  | 95  | 
Loosen the 8 bolts in cable entry covers. Drill holes for conduits in areas shown. 
Install cable lugs on busbars. Use M12 bolts.
Symmetra MW 1000 kW 480 V Installation -   | 9  |